Guangzhou Huadu Shiling LFG Power Generation Project

VCS-2499 ↗

#11of 204 in China#34of 629 in Verra (VCS)#3of 53 in ACM0001

6.8/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
6.5

Audit Analysis

A landfill gas-to-power project in China with a VVB-verified combined additionality test, no reversal events, and a reasonable leakage justification. The project-specific baseline and a material finding about generator reduction (4 to 3) introduce moderate risk, while several data extraction inconsistencies within the same verification report create uncertainty around safeguards and FPIC documentation.

Red Flags

  • Material finding: gas generators reduced from four to three due to equipment failure and decreasing LFG production, indicating operational fragility that could affect future credit generation
  • Contradiction on whether LFG capture is legally required (PDD says yes, 2024 monitoring report says no) — if legally required, additionality is weakened
  • Multiple fields (FPIC, grievance mechanism, benefit sharing, safeguards) show contradictory true/false values within the same verification report dated 2024-10-09, suggesting extraction or reporting inconsistencies

Credit Vintages

IssuedRetiredAvailable
2020
145,096145,0960
2021
92,70292,7020
2022
25,228025,228
Total263,026237,79825,228

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

No reversal events, continuous process

Leakage

0% deemed negligible, reasonable for LFG

Baseline

Project-specific, measured

Safeguards

Documented but extraction contradictions

Double-claim

CORSIA excluded, CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents