Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Mining/mineral productionChina Registry: RegisteredACM0008

Guizhou Mayixi Yijing CMM Power Generation Project

VCS-5026 ↗

#10of 64 in Methane#44of 204 in China#143of 629 in Verra (VCS)#2of 16 in ACM0008

6.1/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.5

Audit Analysis

A registered VCS coal-mine-methane power generation project with VVB-confirmed additionality and a reasonable 0% leakage deduction for a combustion-based activity. The verified ERR matches the monitoring-period ex-ante estimate, and all material findings were closed. However, the project-specific baseline, several missing MRV details, and unresolved contradictions across documents temper confidence in the overall credit quality.

Red Flags

  • Contradiction on whether methane capture is legally required (PDD says yes, validation report says no) — if capture is mandated, additionality is materially weakened
  • Five material findings during validation/verification including use of outdated IPCC emission-factor guidelines and a missing IRR spreadsheet, all closed but indicating initial documentation quality gaps
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Combustion project, no storage, reversal N/A

Leakage

0% deduction, negligible for on-site combustion

Baseline

Project-specific, measured; not yet due for reassessment

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26ACM0008

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents