Guizhou Bijie Yuxing CMM Power Generation Project
#31of 64 in Methane#130of 204 in China#419of 629 in Verra (VCS)#6of 16 in ACM0008
Audit Analysis
A CMM power generation project under VCS methodology ACM0008 with VVB-verified additionality and a conservative first-period delivery ratio (~76% of pro-rata expectation). However, the more recent PDD indicates methane capture is legally required, which materially weakens the additionality claim, and multiple inter-document contradictions (baseline type, leakage justification, benefit sharing) reduce confidence in the data record.
Red Flags
- The more recent PDD (2025-02-15) states that CMM capture is legally required, which directly undermines the additionality claim despite VVB verification of a combined test.
- Three material findings (outdated Tool 27, outdated emission factor source, inconsistent monitoring equipment counts) required corrective actions, indicating quality-control gaps in the monitoring plan.
- The validation report contains an internal contradiction on benefit sharing (both true and false recorded on the same date), raising questions about document consistency.
- No buffer pool percentage is stated in the available documents, leaving permanence risk unquantified.
- Gas capture legally mandated — additionality in doubt
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified but capture legally required per PDD
No reversal risk (power gen) but no buffer pool stated
0% deduction, justification inconsistent across docs
Project-specific, modeled; reassessment not yet due
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated in available docs
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →