CMM power generation project in the new auxiliary shaft of No. 8 coal mine of Hebi Coal Group
#56of 64 in Methane#184of 204 in China#570of 629 in Verra (VCS)#16of 16 in ACM0008
Audit Analysis
This CMM power generation project in China is registered under VCS with a 10-year crediting period and a lifetime ERR claim of approximately 695,000 tCO₂e, but the available documentation reveals significant unresolved concerns: six material findings at validation (including questions about the IRR benchmark, baseline alternative elimination, and methane concentration evidence), a 0% leakage deduction with no justification, and a complete absence of monitoring or verification data. The project's additionality is VVB-confirmed via an investment test, and safeguards (FPIC, grievance mechanism, benefit sharing) are documented, but the overall evidence base is thin and the low extraction confidence further undermines reliability.
Red Flags
- Six material findings at validation, including insufficient substantiation for eliminating baseline alternative P3 (captive power plant) and unvalidated 68.5% power efficiency, with 5 corrective action requests raised
- Leakage deduction of 0% with justification recorded as 'not addressed' in the validation report, despite leakage being a realistic risk in a CMM capture-and-power project
- No monitoring report or verified ERR data found in any available document despite the crediting period starting in May 2021
- Contradiction between the PDD (baseline 'modeled') and the validation report (baseline 'measured'), and between the PDD (leakage 'deemed negligible') and the validation report (leakage 'not addressed')
- Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified investment test, but material findings question
Avoidance project (CMM power gen); no buffer pool or reversa
0% deduction with no justification in a CMM project where le
Project-specific measured baseline; material finding on P3 a
FPIC conducted, grievance mechanism present, benefit sharing
CORSIA and CCP status both not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →