Guizhou Yingxing CMM Power Generation Project
#14of 64 in Methane#70of 204 in China#229of 629 in Verra (VCS)#4of 16 in ACM0008
Audit Analysis
A coal mine methane power generation project in China with VVB-verified additionality and legally mandated capture, delivering slightly above its pro-rata expectation in the first monitoring period. Key gaps include the absence of a stated buffer pool, unaddressed reversal risk, and a project-specific (rather than jurisdictional) baseline. The verification process was thorough, with nine corrective action requests raised and closed, but several operational parameters remain unstated in the available record.
Red Flags
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified for a project where facility shutdown would resume methane emissions
- Reversal events are explicitly noted as 'not addressed' in the extracted record, despite the inherent risk that cessation of CMM capture would release methane back to the atmosphere
- Four contradictions exist across documents, including a discrepancy in the baseline characterization (measured vs. modeled) and the additionality test type (investment vs. combined), suggesting internal inconsistency in project documentation
- Gas capture legally mandated — additionality in doubt
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 45,797 | 0 | 45,797 | |
| 2021 | 88,886 | 0 | 88,886 | |
| Total | 134,683 | 0 | 134,683 |
Risk Indicators
VVB-verified investment test; capture legally required
No buffer pool stated; reversal risk not addressed
Quantified at 0% with justification in monitoring report
Project-specific baseline; measured per monitoring report; g
Grievance mechanism and benefit sharing present; FPIC not st
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →