Guizhou Wangjiazhai CMM Power Generation Project
#36of 64 in Methane#151of 204 in China#472of 629 in Verra (VCS)#7of 16 in ACM0008
Audit Analysis
The Guizhou Wangjiazhai CMM power generation project is a well-understood project type under the mature ACM0008 methodology, with VVB-confirmed additionality and inherently low permanence risk since captured methane is combusted. However, eight material contradictions across documents — including conflicting statements on FPIC, grievance mechanisms, safeguards, baseline type, and leakage justification — significantly undermine confidence in the data. The exact match between claimed and verified ERR figures, combined with three unresolved material findings on stakeholder and land-use documentation, raises concerns about the depth of actual verification.
Red Flags
- Eight contradictions across documents, including conflicting FPIC status, grievance mechanism presence, safeguards documentation, baseline type (measured vs modeled), and leakage justification (quantified vs deemed negligible)
- Claimed and verified ERR are identical (1,499,890 tCO2e), suggesting the 'verification' may be a carry-forward of the ex-ante estimate rather than an independent measurement of actual output
- Financial document reports 149,989 tCO2e — exactly one-tenth of the claimed figure — creating ambiguity about whether the verified figure is annual or lifetime
- Three material findings (CARs) on stakeholder identification, land-use rights, and electricity/CMM authorisation remain in the record, yet the corrective actions list is empty
- Leakage deduction of 0% is justified as 'quantified' in the monitoring report but 'deemed negligible' in the validation report — these are fundamentally different justifications
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Methane combusted; no reversal risk
0% deduction; contradictory justification
Project-specific; measured vs modeled conflict
FPIC and grievance status contradictory; 3 CARs
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →