Henan Nanyang Fangcheng Wind Farm Project
#382of 1935 in Renewable energy#152of 1084 in China#249of 1459 in CDM (UNFCCC)#287of 1287 in ACM0002
Audit Analysis
A CDM wind farm project (CDM-2829) in Henan, China, displacing grid electricity under ACM0002 v7. Additionality was confirmed by TÜV Rheinland via a combined test, and the project type carries inherently low permanence risk. However, 13 corrective actions were raised at validation, multiple inter-document contradictions exist (baseline method, additionality test type, crediting period dates), and the verified ERR for a 3-month window appears disproportionately high relative to the lifetime estimate, warranting caution.
Red Flags
- 13 corrective actions (CAR01–CAR13) were raised during validation, including missing Letters of Approval, inconsistent site distances, outdated emission factors, and an unjustified renewable-energy alternative — all resolved but indicating weak initial documentation quality
- Verified ERR of 10,656 tCO2 for a 3-month monitoring period is approximately 7.4× the pro-rata expectation derived from the 40,152 tCO2 lifetime estimate over 84 months, raising questions about the accuracy of the ex-ante estimate or the monitoring calculation
- Baseline method is described as 'project-specific' in the 2012 monitoring report but 'jurisdictional' in the 2009 validation report, creating ambiguity about the baseline construction
- Grid emission factor of 1.1377 tCO2/MWh is from 2008 and was flagged in CAR06 for needing update with more recent data
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 67,750 | 0 | 67,750 | |
| 2012 | 57,919 | 0 | 57,919 | |
| 2013 | 10,656 | 0 | 10,656 | |
| Total | 136,325 | 0 | 136,325 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, quantified justification
Method contradiction across documents
Mentioned but FPIC/grievance not detailed
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →