Skip to main content
CDMWindChinaACM0002

Henan Nanyang Fangcheng Wind Farm Project

CDM-2829 ↗

#382of 1935 in Renewable energy#152of 1084 in China#249of 1459 in CDM (UNFCCC)#287of 1287 in ACM0002

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.0

Audit Analysis

A CDM wind farm project (CDM-2829) in Henan, China, displacing grid electricity under ACM0002 v7. Additionality was confirmed by TÜV Rheinland via a combined test, and the project type carries inherently low permanence risk. However, 13 corrective actions were raised at validation, multiple inter-document contradictions exist (baseline method, additionality test type, crediting period dates), and the verified ERR for a 3-month window appears disproportionately high relative to the lifetime estimate, warranting caution.

Red Flags

  • 13 corrective actions (CAR01–CAR13) were raised during validation, including missing Letters of Approval, inconsistent site distances, outdated emission factors, and an unjustified renewable-energy alternative — all resolved but indicating weak initial documentation quality
  • Verified ERR of 10,656 tCO2 for a 3-month monitoring period is approximately 7.4× the pro-rata expectation derived from the 40,152 tCO2 lifetime estimate over 84 months, raising questions about the accuracy of the ex-ante estimate or the monitoring calculation
  • Baseline method is described as 'project-specific' in the 2012 monitoring report but 'jurisdictional' in the 2009 validation report, creating ambiguity about the baseline construction
  • Grid emission factor of 1.1377 tCO2/MWh is from 2008 and was flagged in CAR06 for needing update with more recent data

Credit Vintages

IssuedRetiredAvailable
2011
67,750067,750
2012
57,919057,919
2013
10,656010,656
Total136,3250136,325

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, quantified justification

Baseline

Method contradiction across documents

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents