Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Colombia Registry: RegisteredACM0002

HYDROELECTRIC PROJECT ITUANGO

VCS-1065 ↗

#1of 18 in Colombia#15of 629 in Verra (VCS)#7of 383 in ACM0002

7.0/ 10
Integrity
6.4
Transparency
8.2
Claim Safety
5.8
Documentation
8.6

Audit Analysis

Registry-grade evidence is available, including a public validation report, validation deed, and monitoring-related registry PDFs for the VCS hydroelectric project in Colombia. The project has solid documentation and a conservative-looking methodology application, but claim safety is moderated by the very old vintage and the fact that this is a large grid-connected hydro project with only pre-issuance validation evidence provided here.

Red Flags

  • Very old project vintage/validation evidence (2013) increases claim risk if credits are sold as current offsets.
  • No corresponding adjustment or Article 6 authorization evidence provided.
  • No clear recent verification/issuance cycle shown in the provided extract.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

documented evidence

Permanence

mixed evidence / unresolved risk

Leakage

documented evidence

Baseline

documented evidence

Safeguards

mixed evidence / unresolved risk

Double-claim

mixed evidence / unresolved risk

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-04-08ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents