Skip to main content
ScoredCDMSolarChinaRegistry: RegisteredACM0002

Liangzhou District 50MWp Grid-connected Solar PV Power Project

Developer: Sinohydro Wuwei Solar Power Co., Ltd

CDM-9788 ↗

#1322of 4033 in Renewable energy#607of 2297 in China#1271of 4472 in CDM (UNFCCC)#914of 2743 in ACM0002

Assessment

CarbonMeld document-based assessment

01020304 Overall 5.8 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Analysis

A 50 MWp grid-connected solar PV project in China under CDM with a well-supported combined additionality test verified by ERM and a jurisdictional baseline. The project type carries no carbon-stock reversal risk, and the negligible leakage treatment is appropriate for grid-connected generation. However, the absence of any monitoring or verification data in the extracted record, combined with low extraction confidence and resolved IRR calculation errors, limits confidence in the full data trail.

Red Flags

3 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

No issuances recorded on the registry.

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →