Maracanã Small Hydropower Project

CDM-8474 ↗

4.9 / 10
Integrity
5.2
Transparency
4.6
Claim Safety
4.3
Documentation
5.4

Score Breakdown

Integrity

verified The validation report confirms additionality using an investment test and VVB confirmation (RINA Services S.p.A., 2020).

missing Baseline is project-specific and the timing of any baseline reassessment is not stated in the extracted record (PDD/validation record).

Transparency

verified The VVB is identified (RINA Services S.p.A.) and the applicable methodology is specified (AMS-I.D v18.0) in the validation record (2020).

missing Monitoring period and verified/claimed ER totals are not found in the extracted record, limiting MRV transparency (available documents list).

Claim Safety

verified The project is stated as not CORSIA-eligible, reducing aviation-claim channel risk (extracted registry fields).

missing Over-crediting risk cannot be well assessed because grid emission factor value, ER totals, and leakage treatment are not evidenced in the extracted record (PDD/validation record).

Documentation

verified A recent validation report is available (dated 2020-09-01) and no material findings or corrective actions are reported in that record.

missing Extraction confidence is only medium and key quantitative fields (ERs, monitoring period, leakage deduction) are missing from the extracted record despite multiple documents listed.

Detailed Analysis

Integrity

The validation report (2020) indicates additionality was assessed via an investment test and confirmed by the VVB (RINA Services S.p.A.), which supports additionality robustness. However, the baseline is described as project-specific and the timing of any baseline reassessment is not stated in the extracted record, which weakens confidence in baseline validity over the 2019–2026 crediting period. Leakage is explicitly not addressed in the extracted record and no leakage deduction is provided, creating an integrity gap for an avoidance renewable energy project where indirect effects may need justification.

Transparency

Transparency is constrained because the monitoring period is not stated in the extracted record and neither claimed nor verified emission reductions are provided, preventing cross-checks between monitoring and verification outcomes. On the positive side, the validation record identifies the VVB (RINA Services S.p.A.) and specifies the methodology (AMS-I.D v18.0), which helps trace the intended MRV approach. The registry is indicated as CDM while the user states Gold Standard, but no discrepancy is flagged in the extracted contradictions list, so transparency remains limited rather than penalized for a documented conflict.

Claim Safety

Claim safety is moderated by the project being stated as not CORSIA-eligible, which reduces the risk of aviation-related double-claim channels. However, the extracted record lacks key quantification inputs/outputs (grid emission factor value, claimed/verified ER totals, and monitoring period), making it difficult to judge over-crediting risk. Leakage is not addressed, and safeguards elements (FPIC, grievance mechanism, benefit-sharing) are not evidenced, increasing reputational/greenwashing risk for end users making high-confidence claims.

Documentation

Documentation is mid-range: a dated validation report (2020-09-01) is present and the extracted record shows no material findings or corrective actions in that report. Still, several critical fields are not found in the extracted record (monitoring period, ER totals, leakage deduction, baseline reassessment timing), despite multiple documents being listed (validation report, PDD, and others). The minimum extraction confidence is medium, which suggests some limitations in document readability or extraction completeness and reduces confidence in the record’s completeness.

Overall

No explicit contradictions are listed in the extracted record, so no score adjustment is made for internal document discrepancies. The overall score is driven down primarily by evidence gaps in MRV/quantification (missing monitoring period and ER totals), unaddressed leakage, and absent safeguards/grievance documentation in the extracted record, despite VVB-confirmed additionality in the validation report (2020). Note: post-scoring gate rules may cap transparency if documentation were to fall below 3.0, but documentation is scored above that threshold here.

Audit Analysis

This small hydropower project has VVB-confirmed additionality via an investment test, but key integrity elements (baseline reassessment timing, leakage treatment, and quantified ER results) are not evidenced in the extracted record. Safeguards and grievance provisions are not documented, and MRV/registry completeness is limited by missing monitoring-period and verified ER figures.

Project Description

Other crediting period(s): 07 Dec 12 - 06 Dec 19 Requests for Issuance and related documentation Maracanã is a run of river small hydropower plant with an installed capacity of 10.656 MW, located in Nova Marilândia, Brazil. It reduces an average of 17,183 tCO2 per year. The project activity has several social and environmental programs like providing historical data over soil and water quality of its area of influence…

Red Flags

  • Leakage is not addressed and no leakage deduction is evidenced in the extracted record, despite being an avoidance project with potential upstream/downstream impacts.
  • No verified or claimed emission reductions and no monitoring period are provided in the extracted record, limiting confidence in credit quantification.
  • Safeguards, FPIC, grievance mechanism, and benefit-sharing are not evidenced in the extracted record.

Credit Vintages

Issued Retired Available
2016
44,214 0 44,214
2021
92,382 0 92,382
Total 136,596 0 136,596

Cosa migliorerebbe questo punteggio

  • Provide the monitoring report and verification statement with the monitoring period and claimed vs verified emission reductions, including any uncertainty/adjustments.
  • Document leakage assessment and, if applicable, a quantified leakage deduction or a clear justification for negligible leakage consistent with the methodology.
  • Publish and evidence safeguards implementation (FPIC where relevant, grievance mechanism, stakeholder consultation outcomes, and benefit-sharing arrangements).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversal risk evidenced

Leakage

Leakage not addressed

Baseline

Project-specific; reassessment timing unclear

Safeguards

No FPIC/grievance/safeguards evidenced

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti