MRMPL Wind Power Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, which is a meaningful positive signal.
missing Leakage treatment is not clearly evidenced in the extracted record, and the baseline was project-specific with no reassessment date found.
Transparency
verified The monitoring period and verified emission reductions are stated, and the VVB is identified as TÜV SÜD South Asia Pvt. Ltd.
missing Several core MRV details are not stated in available documents, including usage monitoring method and baseline reassessment timing.
Claim Safety
verified The project is an avoidance wind project, which generally lowers permanence risk compared with removal projects.
missing Contradictory emission reduction totals and crediting-period dates create over-crediting and record-consistency concerns.
Documentation
verified Eighteen documents were used and the extraction confidence is medium rather than low.
missing Corrective actions were required for date and methodology mismatches, and the evidence set includes several unresolved contradictions.
Detailed Analysis
Integrity
The verification report identifies additionality through an investment test and says there were no material findings, which supports the project’s core integrity. However, the extracted record does not clearly state a leakage deduction, buffer pool contribution, or baseline reassessment date, so several permanence and baseline controls remain weakly evidenced. The project is an avoidance wind project, so reversal risk is inherently lower than for removals, but the documentation gaps still matter.
Transparency
The monitoring period, VVB name, and verified emission reductions are available, which helps basic traceability. At the same time, key MRV details are missing from the extracted record, including the usage monitoring method and any baseline reassessment timing. The registry status is withdrawn, which does not itself prove poor transparency, but it does reduce confidence in the current public claim environment.
Claim Safety
Claim safety is weakened by the contradictions in the extracted record, especially the different verified emission reduction totals and different crediting-period dates across documents. I privileged the later 2022 figures because they appear to come from the more recent verification material, but the presence of conflicting earlier values still raises over-crediting and record-consistency concerns. The project is not shown to be CORSIA-eligible or CCP-approved in the extracted record, so there is no strong external quality endorsement to offset those issues.
Documentation
The record draws on 18 documents and the extraction confidence is medium, which is acceptable but not strong. Still, the verification material required corrective actions for mismatched crediting-period dates and methodology/tool versions, indicating documentation inconsistency. I privileged the more recent 2022 values over older 2018/2010 values because they are later and appear tied to the latest verification cycle, but the unresolved contradictions lower confidence overall.
Overall
Overall, this is a mid-quality record with some real strengths but notable reliability concerns. I privileged the later 2022 verification figures for emission reductions and crediting period because they are more recent and appear to reflect the latest verification cycle, but I still penalized the score because the extracted record explicitly contains contradictions on those same fields. The withdrawn registry status, required corrective actions, and missing leakage/baseline detail keep the project below a strong-confidence rating.
Audit Analysis
This wind project has some positive integrity signals, including VVB-confirmed additionality and no reported material findings, but the record also shows important reliability issues and unresolved documentation mismatches. The project is now withdrawn on the registry, and several key items such as leakage treatment, baseline reassessment, and usage monitoring are not clearly documented in the extracted record.
Project Description
This project generated electricity from wind power by installing 16 Wind Turbine Generators (WTG) in Jaisalmer, Rajasthan. Each WTG had a capacity of 1.25 MW, resulting in a total installed capacity of 20 MW. The purpose of the project was to produce clean power and reduce reliance on fossil fuels, and a power purchase agreement (PPA) was signed with Jodhpur Vidyut Vitran Nigam Limited (JVVNL) to export the electricity to the local grid.
Red Flags
- Registry status: WITHDRAWN — project withdrawn from the registry (terminal)
- The extracted record contains multiple contradictions, including different credited periods and different verified emission reduction totals across documents.
- Corrective actions were required for mismatched crediting-period dates and methodology/tool versions, which weakens confidence in the reported figures.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 20,568 | 19,632 | 936 | |
| 2013 | 21,507 | 21,507 | 0 | |
| 2014 | 21,340 | 21,340 | 0 | |
| 2015 | 18,328 | 18,328 | 0 | |
| 2016 | 22,317 | 22,317 | 0 | |
| 2017 | 21,473 | 21,473 | 0 | |
| 2018 | 24,588 | 24,588 | 0 | |
| 2019 | 3,028 | 2,447 | 581 | |
| Total | 153,149 | 151,632 | 1,517 |
Cosa migliorerebbe questo punteggio
- Provide a clean, reconciled verification trail that explains the differing crediting periods and emission reduction totals across documents.
- Publish explicit leakage treatment, baseline reassessment history, and complete MRV procedures for the monitoring period.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance wind project
No clear quantified leakage treatment
Project baseline, reassessment not stated
Grievance mechanism present, FPIC not shown
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →