Wind Power Project at Rajkot, Gujarat

VCS-1045 ↗

4.9 / 10
Integrity
5.4
Transparency
4.8
Claim Safety
4.6
Documentation
4.2

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test, which is stronger than an unverified assertion.

missing Leakage is not addressed, and reversal handling is inconsistent across documents, with one record saying reversal events are not applicable and another saying they are not addressed.

Transparency

verified The project has a named VVB, a defined monitoring period from 2023-07-01 to 2023-12-31, and a recent issuance document dated 2024-05-13.

missing Claimed versus verified ER totals are not available, and key monitoring details such as grid emission factor and usage monitoring method are not found in the extracted record.

Claim Safety

verified The project is marked CORSIA-eligible, and the baseline was last reassessed in 2021, which is better than an outdated baseline with no review.

missing Leakage is not addressed and the record contains contradictions on additionality framing, FPIC, and crediting period, increasing over-crediting and greenwashing risk.

Documentation

verified The record draws on many extracted items and includes a named verifier plus a recent issuance document.

missing The extraction confidence is only medium, evidence documents are not clearly enumerated, and multiple CARs/CLs were raised during verification.

Detailed Analysis

Integrity

The project has a positive integrity signal because the VVB, Earthood Services Private Limited, confirmed additionality through an investment test, and the baseline was last reassessed in 2021. That said, leakage is explicitly marked as not addressed, and reversal treatment is inconsistent: one field says reversal events are not applicable while another says they are not addressed. The verification also recorded multiple corrective and clarification requests, which reduces confidence in the robustness of the project claims.

Transparency

Transparency is mixed. The monitoring period is stated as 2023-07-01 to 2023-12-31, the project has a named verifier, and the issuance document is recent, but the extracted record does not provide claimed or verified ER totals, grid emission factor values, or a usage monitoring method. The absence of these core MRV details limits public traceability and makes it harder to assess the reported issuance.

Claim Safety

Claim safety is weakened by the lack of leakage treatment and by several contradictions across documents. The record shows CORSIA eligibility, but CCP status is not stated, so dual-market risk cannot be fully ruled out from the extracted facts alone. The baseline is a project baseline rather than a clearly standardized jurisdictional baseline, and the conflicting statements on additionality, FPIC, and crediting period increase over-crediting concern.

Documentation

Documentation quality is moderate at best. There are many extracted facts and a named VVB, but the extraction confidence is only medium and the evidence document list is not clearly populated beyond an unknown entry. The verification also raised multiple CARs and CLs, including issues with the MR template, schematic diagram, and project proponent details, which suggests documentation gaps even though the findings were reportedly closed.

Overall

Overall, this is a moderately credible avoidance project with some strong points, especially VVB-confirmed additionality and a recent verification cycle. However, the contradictions must be weighted carefully: I privileged the newer 2024 records over older 2013/2022 statements for additionality test type, FPIC, benefit sharing, leakage, reversal handling, and crediting period because they are more recent and appear to reflect the latest verification/issuance package. Even after privileging the newer records, the unresolved leakage treatment, inconsistent reversal language, and multiple verification findings keep the score below strong-quality territory.

Audit Analysis

This is a VCS wind project with VVB-verified additionality and a recent verification/issuance record, which supports some credibility. However, leakage is not addressed, reversal handling is inconsistent across documents, and several corrective actions were raised, so the claim quality is only moderate.

Project Description

Wind Power Project at Rajkot, Gujarat is a Vertified Carbon Standard (VCS) verified renewable energy wind power project based in India.This project reduce CO2 emissions by displacing electricity that would otherwise be produced through other sources of energy including fossil fuels, with renewable wind power. The project is projected to save 47244 tCO2e per year.

Red Flags

  • Leakage justification is marked as not addressed, despite a project type where leakage treatment should be explicit.
  • The documents conflict on the crediting period, additionality test framing, FPIC, benefit sharing, and reversal treatment, which weakens reliability.

Credit Vintages

Issued Retired Available
2012
26,350 26,350 0
2015
28,070 28,070 0
2016
53,326 41,536 11,790
2017
50,824 39,587 11,237
2018
48,095 37,474 10,621
2019
51,031 39,749 11,282
2020
40,377 34,409 5,968
2021
41,264 3,631 37,633
2022
39,158 481 38,677
2023
37,843 24,982 12,861
Total 416,338 276,269 140,069

Cosa migliorerebbe questo punteggio

  • Provide a clear, quantified leakage assessment or a documented justification for why leakage is negligible.
  • Publish a reconciled MRV package that resolves the contradictions on FPIC, benefit sharing, reversal treatment, and crediting period, with the verified ER totals clearly stated.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversal risk for avoidance, but handling is inconsistent

Leakage

Leakage not addressed

Baseline

Project baseline with reassessment timing known

Safeguards

FPIC and grievance mechanism present, but contradictory reco

Double-claim

CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-18 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti