Renewable Projects at Belagavi, Karnataka
#385of 421 in Universal Carbon Registry (UCR)#37of 42 in AMS-I.C
Audit Analysis
This renewable energy project in Karnataka, India (solar PV, wind, and biogas under Gold Standard methodologies) claims 187,559 tCO2e over a ~9.7-year crediting period, but the available record consists solely of a PDD with no verification report, monitoring data, or identified verification body. The absence of documented additionality testing, verified emissions reductions, and any independent oversight makes it impossible to confirm the integrity of the claimed credits.
Red Flags
- No verification body identified and no verification report available in the extracted record — additionality and ERR cannot be independently confirmed
- 187,559 tCO2e claimed with no verified figure; the sole document is a PDD dated 2022-09-26 with no subsequent monitoring or verification evidence
- No additionality test type or VVB confirmation found in any available document
- Project-specific baseline with no reassessment date recorded, and no FNRB or usage-rate data to validate the grid-displacement assumption
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found
RE project (low reversal risk) but no buffer pool documented
0% deemed negligible — plausible for RE but justification is
Project-specific baseline, no reassessment date recorded
Safeguards and benefit sharing mentioned; no grievance mecha
CORSIA and CCP status both unstated — dual-channel risk unas
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →