VCSEnergy industries (renewable/non-renewable sources)IndiaACM0002

Renewable Wind Power Project by Hero Future Energies

VCS-1946 ↗

#91of 770 in Renewable energy#49of 387 in India#112of 629 in Verra (VCS)#64of 383 in ACM0002

6.3/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
7.0
Documentation
5.5

Audit Analysis

A 26 MW wind power project in India under VCS ACM0002 that over-delivered by 35% relative to its ex-ante estimate, with no reversal events and an appropriate zero-leakage treatment. However, multiple contradictions between documents (baseline method, additionality test type, leakage justification) and a high volume of corrective action requests (10 in one verification cycle) introduce moderate uncertainty about data reliability. The project is fundamentally sound for a renewable energy credit but carries documentation-quality concerns.

Red Flags

  • Baseline method is contradictory: the 2025 verification report states a project-specific baseline while the 2023 verification report references a jurisdictional baseline — the more conservative (project-specific) interpretation is privileged but the inconsistency undermines confidence in baseline robustness.
  • Ten corrective action requests were raised and closed in a single verification cycle (2025 report), including missing approvals, incorrect geo-coordinates, and a mathematically incorrect baseline emission calculation, indicating recurring documentation quality issues.
  • Additionality test type is inconsistent across documents: the 2019 validation report records a 'combined' test while the 2025 verification report records an 'investment' test only; the more recent verification is privileged but the discrepancy is unexplained.
  • Leakage justification is contradictory: the 2025 monitoring report describes leakage as 'quantified' while the 2025 verification report records it as 'deemed negligible' with a 0% deduction; the VVB's assessment is privileged but the inconsistency is unaddressed.

Credit Vintages

IssuedRetiredAvailable
2017
102,753102,7530
2019
4,32804,328
2020
36,98527,1199,866
2021
53,55142,85210,699
2022
57,4313,05554,376
Total255,048175,77979,269

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversal risk (wind power)

Leakage

0% – appropriate for grid-connected wind

Baseline

Project-specific; method contradicts 2023 report

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0002: Grid-connected electricity generation from renewable sources

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents