Vai al contenuto principale
VCS avoidance India Vintage 2023 Registry: Registered Documentazione completa General Methodology v2.0

Renewable Wind Power Project by Adani

VCS-2042 ↗

4.4 / 10
Integrity
4.8
Transparency
4.2
Claim Safety
4.5
Documentation
3.6

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test in the verification report.

missing Leakage is marked as not addressed in the latest verification record, and reversal risk is also not addressed.

Transparency

verified The project has a named VVB and a defined monitoring period in the verification report.

missing The extracted record does not provide claimed emissions reductions for comparison, and several MRV fields such as usage monitoring and grid factors are not stated.

Claim Safety

verified The project is an avoidance project under VCS with a verified monitoring result of 652,424 tCO2e.

missing The baseline is project-specific rather than a recently reassessed standardized baseline, and leakage treatment is weakly documented.

Documentation

verified The record includes a recent verification report dated 2023-10-28 and multiple official documents were used.

missing Extraction confidence is low, and the verification report still lists several corrective actions and clarification requests.

Detailed Analysis

Integrity

The verification report from VKU Certification Pvt. Ltd. confirms additionality through an investment test, which supports the project’s core integrity case. However, the latest record says leakage is not addressed and reversal risk is not addressed, and the buffer pool percentage is not found in the extracted documents. The report also lists multiple corrective action requests and clarification requests, indicating some unresolved quality issues in the monitoring package.

Transparency

Transparency is weakened by missing or unstated MRV details, including the usage monitoring method, grid emission factor, and claimed emissions reductions. The monitoring period is stated and the VVB is named, which helps, but the extracted record does not provide a complete public-facing accounting trail. Because extraction confidence is low, confidence in the completeness of the documentation is further reduced.

Claim Safety

Claim safety is moderate at best because the project uses a project-specific baseline and the latest verification record does not address leakage. The verified quantity of 652,424 tCO2e provides a concrete figure, but the record does not show the claimed amount for reconciliation, and the absence of a clear leakage deduction increases over-crediting risk. No evidence of CORSIA eligibility or CCP approval is provided, so dual-claim risk cannot be ruled out from the extracted record.

Documentation

The documentation set is reasonably broad, with 17 documents used and a recent verification report dated 2023-10-28. Even so, the extraction confidence is low, and the report still contains several corrective action requests and a clarification request about missing stakeholder consultation detail and undefined terminology. The crediting period is long and the monitoring period is recent, but the record remains incomplete on several key fields.

Overall

Overall, this is a mid-quality avoidance project with a verified additionality claim but notable documentation and MRV weaknesses. I privileged the latest verification report for leakage, reversal risk, and additionality characterization because it is the most recent and operationally relevant document; that means I treated the earlier negligible-leakage and combined-test statements as superseded or at least less reliable. The contradictions in leakage justification, additionality test type, reversal events, and benefit-sharing documentation reduce reliability and justify a downward adjustment in the scores.

Audit Analysis

The project has some positive signs, including VVB-confirmed additionality and a registered VCS status, but the evidence base is thin and several key safeguards are not well documented. The latest verification report also shows unresolved or weakly addressed issues around leakage, reversal risk, and report completeness, which lowers confidence in the claimed credits.

Project Description

Renewable Wind Power Project by Adani is a Vertified Carbon Standard (VCS) verified renewable energy wind power project based in India. The project has a total capacity of 150 MW and consists of 74 wind turbines. This project reduce CO2 emissions by displacing electricity that would otherwise be produced through other sources of energy including fossil fuels, with renewable wind power. The project is projected to save 172333 tCO2e per year. The project also contributes to sustainable development in the region by providing employment opportunities, improving infrastructure, and promoting clean technology investment.

Red Flags

  • Leakage is not addressed in the latest verification record, while an earlier document reportedly treated it as negligible.
  • The verification report lists multiple corrective action requests and clarification requests, including missing stakeholder consultation detail and undefined terminology.

Credit Vintages

Issued Retired Available
2019
58,357 57,365 992
2020
307,057 181,442 125,615
2021
354,217 340,147 14,070
2022
329,047 207,053 121,994
2023
327,482 47,625 279,857
Total 1,376,160 833,632 542,528

Cosa migliorerebbe questo punteggio

  • Publish a complete reconciliation of claimed versus verified emissions reductions, including leakage treatment, baseline calculations, and any buffer or reversal provisions.
  • Provide a cleaner, fully consistent monitoring and verification package that resolves the listed CARs/CLs and clearly defines all project terminology and stakeholder consultation steps.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

reversal risk not addressed

Leakage

leakage not addressed

Baseline

project-specific baseline

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti