Shandong Gaotang 30MW Biomass Power Generation Project
Score Breakdown
Integrity
verified No material findings or corrective actions are reported in the monitoring report (2015).
missing Leakage approach is inconsistent between the PDD (2011) and monitoring report (2015), and no leakage deduction percentage is provided in the extracted record.
Transparency
verified Monitoring period is clearly stated (2012-12-26 to 2015-03-19) in the monitoring report (2015).
missing The VVB name and key MRV parameters (e.g., FNRB method/value, grid EF year) are not found in the extracted record.
Claim Safety
missing CORSIA eligibility and CCP status are not stated in the extracted record, increasing uncertainty for downstream claims.
missing The extracted record shows verified ERs higher than claimed ERs, creating ambiguity about what was actually issued/credited.
Documentation
verified Three core document types are present (PDD, validation report, monitoring report) with high extraction confidence.
missing Crediting period end date is not stated, and several key fields (VVB name, leakage deduction %, baseline reassessment timing) are missing from the extracted record.
Detailed Analysis
Integrity
The project applies a project-specific baseline under ACM0006 (methodology version 04), which is generally acceptable but weaker than standardized/jurisdictional baselines, and the timing of any baseline reassessment is not stated in the extracted record. Leakage is a key integrity uncertainty: the monitoring report (2015) deems leakage negligible, but the PDD (2011) indicates leakage was quantified, and no leakage deduction percentage is provided. Additionality is described as an investment test, but confirmation by the VVB is not found in the extracted record, reducing confidence in additionality robustness.
Transparency
The monitoring report (2015) provides a clear monitoring period (2012-12-26 to 2015-03-19) and reports no material findings or corrective actions. However, important transparency elements are missing from the extracted record, including the VVB name, the grid emission factor year, and any FNRB method/value information. The extracted record also contains an unusual relationship between claimed and verified ER totals that cannot be explained without the verification report details.
Claim Safety
Over-crediting/claims risk is elevated because the extracted record shows total verified ERs (432,993) exceeding total claimed ERs (313,769), which is atypical and requires checking the verification statement and issuance records to ensure correct interpretation. Leakage treatment inconsistency between the PDD (2011) and monitoring report (2015) further increases uncertainty about net climate benefit. CCP status and CORSIA eligibility are not stated in the extracted record, so the project’s suitability for higher-integrity claims cannot be confirmed.
Documentation
The extracted record includes three key document types (PDD, validation report, monitoring report) and the minimum extraction confidence is high, supporting moderate documentation quality. Still, several critical fields are not found in the extracted record (VVB name, leakage deduction percentage, baseline reassessment timing, buffer pool/reversal provisions), limiting auditability from the extracted dataset alone. The crediting period end date is also not stated, which reduces clarity on the current status of crediting.
Overall
One explicit contradiction must be resolved: the PDD (2011) indicates leakage was quantified, while the monitoring report (2015) deems leakage negligible. For scoring, the monitoring report is privileged as the more recent operational document, but the inconsistency itself reduces confidence and lowers integrity and claim-safety scores until reconciled. Separately, the extracted record shows verified ERs higher than claimed ERs; without the verification report values and context, this is treated as a reliability risk and also depresses transparency and claim-safety.
Audit Analysis
The project has some core CDM elements documented (methodology ACM0006, monitoring period, and a stated investment additionality test), but key integrity details are missing or inconsistent, especially around leakage treatment and third-party confirmation of additionality. The verified ER figure is higher than the claimed figure in the extracted record, which raises reliability and over-crediting interpretation risks without the underlying verification details.
Project Description
The Shandong Gaotang 30MW Biomass Power Generation Project (hereafter referred to as the Project) is located in Gaotang County, Liaocheng City, Shandong Province, P.R.China. Gaotang County, with rich agricultural resources, is one of the biggest agriculture bases in the northwest of Shandong province. The implementation of the project will realize biomass comprehensive utilization in the province and serve as a demonstration project in China. The project will utilize local surplus biomass residues (cotton straw, wood residues and wheat bran) 1 for generating electricity. The install capacity is 30MW and the straw-fired boiler is imported from Denmark BWE Company, which is a world leading company in biomass boilers production and biomass cogeneration. The project will assist in transferring advanced biomass technology to China. It is estimated that the Project can deliver 187,626 MWh/y of electricity to the North China Grid, which consume nearly 247,506 tons biomass residues on wet base per year.
Red Flags
- Leakage treatment is inconsistent across documents: the PDD indicates leakage was quantified, while the monitoring report deems leakage negligible.
- Additionality is described as an investment test, but third-party confirmation by the VVB is not found in the extracted record.
- Verified ERs (432,993) exceed claimed ERs (313,769) in the extracted record, which is unusual and needs reconciliation with the verification statement.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 143,007 | 0 | 143,007 | |
| 2014 | 528,473 | 0 | 528,473 | |
| 2016 | 313,769 | 0 | 313,769 | |
| 2022 | 758,282 | 0 | 758,282 | |
| Total | 1,743,531 | 0 | 1,743,531 |
Cosa migliorerebbe questo punteggio
- Provide the verification report details (including VVB name and the verified ER calculation) to reconcile why verified ERs exceed claimed ERs in the extracted record.
- Clarify leakage treatment with a consistent approach across documents and disclose the applied leakage deduction percentage (or quantified result) for the monitoring period.
- Disclose safeguards evidence (FPIC where relevant, stakeholder consultation outcomes, and a functioning grievance mechanism) in publicly available documentation.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Investment test stated; VVB confirmation not found
Reversal/buffer provisions not documented in extracted record
Leakage treatment inconsistent; deduction not provided
Project-specific baseline; reassessment timing not stated
No FPIC, grievance mechanism, or safeguards documentation found
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →