No public grade applies yet
Wayang Windu Phase 2 Geothermal Power Project
- Standard
- CDM
- Methodology
- ACM0002 (CDM)
- Registry
- CDM-3193 ↗ · Registered
- Country
- Indonesia
- Credit type
- Geothermal
CarbonMeld's document-based rating gives Wayang Windu Phase 2 Geothermal Power Project (CDM-3193) no number (No public grade applies yet): CarbonMeld read its documents, but its type of project does not yet have a public grade that applies to it on both additionality and quantification. The absence of a number says nothing about the project's quality.
Assessment
How this analysis was made
- Our method
- CarbonMeld methodology v3 · documents read on 4 Nov 2026
Evidence
Eligibility & market
Under decision 4/CMP.20 of the Parties to the Kyoto Protocol (FCCC/KP/CMP/2025/7/Add.1, paragraph 5), the submission of requests for issuance of new CERs was discontinued as of 30 June 2026; requests to transfer CERs to the Article 6.4 mechanism registry, cancellations and any other transactions in the CDM registry are discontinued as of 31 December 2026. The UNEP-CCC Article 6 Pipeline (checked 2 Nov 2026) lists the transition of this activity to the Article 6.4 mechanism as approved. This page keeps the project's record.
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 1,153,790 | 0 | 1,153,790 | |
| 2013 | 401,492 | 0 | 401,492 | |
| 2015 | 1,505,313 | 0 | 1,505,313 | |
| 2019 | 1,681,431 | 0 | 1,681,431 | |
| 2022 | 2,237,274 | 0 | 2,237,274 | |
| Total | 6,979,300 | 0 | 6,979,300 |
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Report an error on this page
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Report an error on this page →Cite this page
CarbonMeld (2026). Wayang Windu Phase 2 Geothermal Power Project (CDM-3193): CarbonMeld document-based analysis, methodology v3, documents read on 4 Nov 2026. https://carbonmeld.com/projects/wayang-windu-phase-2-geothermal-power-project-cdm-3193/.
The citation names the analysis by its methodology version and the day the documents were read; the page gives no number.
Records with the same name in other registries
Records in another registry with the same name, country and methodology. Each has its own credits, documents and rating.
- Wayang Windu Phase 2 Geothermal Power ProjectVerra · VCS-688
Similar projects
Same methodology or sector, the same registry first.
- Huaneng Tongyu Xinhua 1B Wind Farm ProjectCDM-4917
- Songlinhe Cascade-1 45MW Hydropower ProjectCDM-V8GG0MOY638
- Jiangsu Qidong Donghai Wind Power ProjectCDM-5490
- Fuerza Eolica del Istmo Wind FarmCDM-2390
- Guohua Hulunbeier Xinbaerhuzuoqi Bayanchagan 49.5MW Wind Farm ProjectCDM-7805
- Fujian Beijin Hydropower ProjectCDM-1478
- Huadian Xuwen Huangtang Wind Power ProjectCDM-6895
- Inner Mongolia Beijing Energy Shangdu Jiqingliang Wind Farm IICDM-5567
