Skip to main content
CDMHydroUgandaAMS-I.A

West Nile Electrification Project (WNEP)

CDM-0775 ↗

This rating is archived — the project is no longer listed or its registry data has changed. This is the last published analysis (2026-08-13).
5.1/ 10
Integrity
5.8
Transparency
4.8
Claim Safety
4.2
Documentation
5.7

Audit Analysis

The project demonstrates verified additionality but is constrained by significant methodological non-compliances and missing verified performance data. Contradictions across monitoring reports regarding claimed emission reductions and leakage treatment reduce confidence in data reliability, resulting in a moderate overall quality rating.

Red Flags

  • Verified emission reduction totals are entirely missing from the extracted records
  • Multiple PDD non-compliances requiring formal corrective actions
  • Contradictory leakage justification and claimed credit volumes across monitoring reports

Credit Vintages

IssuedRetiredAvailable
2012
20,095020,095
2014
11,331011,331
2015
9,52509,525
2016
8,31108,311
2020
31,925031,925
Total81,187081,187

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Low reversal risk, no buffer documented

Leakage

Zero deduction with contradictory justification

Baseline

Project-specific, last reassessed 2014

Safeguards

Mentioned but FPIC/grievance details missing

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-13AMS-I.A

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents