Vai al contenuto principale
GS Wind India Documentazione completa General Methodology v2.0

Wind Energy Project in Gujarat by Enn Enn Corp Limited

GS-2600 ↗

4.0 / 10
Integrity
3.8
Transparency
4.2
Claim Safety
3.9
Documentation
4.1

Score Breakdown

Integrity

verified Additionality was confirmed by URS Verification Private Limited using an investment test, which is stronger than an unverified claim.

missing Leakage is not addressed in the monitoring report, and the project uses a project baseline rather than a more robust standardized baseline.

Transparency

verified The monitoring period is clearly stated, and the project identifies the verifier as URS Verification Private Limited.

missing The extracted record does not provide verified or claimed emission reduction totals, and the monitoring report contains many corrective actions.

Claim Safety

verified The project is a wind renewable-energy activity with smart-meter-based usage monitoring, which supports basic MRV credibility.

missing The monitoring report says leakage is not addressed, and the contradiction with the validation report’s negligible-leakage view lowers confidence in over-crediting risk.

Documentation

verified The record includes multiple official document types, and extraction confidence is high.

missing The monitoring report lists numerous material findings and corrective actions, and the crediting-period dates conflict with the validation report.

Detailed Analysis

Integrity

The project’s additionality was confirmed by the VVB through an investment test, which is a meaningful positive. On the negative side, the monitoring report says leakage is not addressed, reversal events are not addressed, and the baseline is project-specific rather than a more robust standardized approach. The large number of material findings and corrective actions in the monitoring report further weakens confidence in the integrity of the credited reductions.

Transparency

The monitoring period is clearly stated, the verifier is named as URS Verification Private Limited, and usage monitoring is described as smart-meter based. However, the extracted record does not include verified or claimed emission reduction totals, which limits public traceability of the credited volume. The monitoring report also contains many corrective actions, indicating that the documentation package was not fully clean.

Claim Safety

As a wind project, the activity type is inherently lower risk than many land-use projects, and smart-meter monitoring supports measurement quality. Even so, leakage is not addressed in the monitoring report, and the project relies on a project baseline rather than a more conservative standardized baseline. The contradiction between the monitoring report and the older validation report on leakage treatment increases over-crediting concern.

Documentation

The record draws on several official sources, including a monitoring report, validation report, PDD, and stakeholder consultation material, and extraction confidence is high. Still, the monitoring report lists many corrective actions, and the crediting-period dates conflict between the monitoring report and validation report. That inconsistency, together with missing key quantitative fields, keeps documentation quality only moderate.

Overall

I privileged the monitoring report for the leakage treatment because it is more recent and directly tied to the monitored period, while the older validation report’s negligible-leakage statement is less current. I also privileged the validation report for additionality because it explicitly confirms the investment test, while the PDD’s broader combined-test framing is less specific. The crediting-period contradiction between the monitoring report and validation report is a material reliability issue, and the many corrective actions in the monitoring report justify a downward adjustment to the overall score.

Audit Analysis

This wind project has some positive signs, including VVB-confirmed additionality and documented safeguards such as FPIC and a grievance mechanism. However, the record shows many corrective actions, weak leakage treatment, and several documentation gaps and contradictions that reduce confidence in the claimed reductions.

Project Description

Developer: EKI Energy Services Limited Type: Wind Size: Small Scale Methodology: AMS-I.D. Grid connected renewable electricity generation Crediting period: 2014-12-04 → 2024-12-03 Estimated annual credits: 21085 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 13: Climate Action, Goal 7: Affordable and Clean Energy

Red Flags

  • The monitoring report lists many corrective actions and material findings, suggesting substantial documentation and compliance issues.
  • Leakage is marked as not addressed in the monitoring report, while the older validation report treated it as negligible, creating a reliability concern.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Provide a complete, reconciled emissions statement with verified and claimed reduction totals, plus a clear explanation of any discrepancies across documents.
  • Document leakage treatment, reversal risk management, and the basis for the crediting-period dates in a single consistent monitoring package.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversal treatment stated

Leakage

Leakage not addressed

Baseline

Project baseline, reassessed in 2021

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-17 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti