Wind Power Project In Maharashtra State, India

VCS-1693 ↗

4.6 / 10
Integrity
5.4
Transparency
4.2
Claim Safety
4.8
Documentation
3.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test, which supports the project’s core crediting case.

missing No buffer pool percentage is stated, and the issuance record still lists multiple corrective actions, including host-country approval and prior-consideration issues.

Transparency

verified The monitoring and crediting period are clearly stated, and the VVB is identified as LGAI Technological Center, S.A. (Applus+).

missing Claimed emissions reductions are not stated in the extracted record, and the usage monitoring method is also not found.

Claim Safety

verified The project is an avoidance project under a project-specific baseline, which is generally more straightforward than removal-credit claims.

missing Leakage justification is inconsistent across documents, and key over-crediting checks such as verified usage rates and jurisdictional factors are not available.

Documentation

verified Eleven documents were used, and the issuance record reports no material findings.

missing Extraction confidence is low, and the record shows several unresolved corrective actions plus at least one contradiction on safeguards and leakage treatment.

Detailed Analysis

Integrity

The VVB confirmed additionality through an investment test, which is a meaningful positive for integrity. The project reports no reversal events, and the issuance record lists no material findings. That said, there is no buffer pool percentage in the extracted record, and the project still had multiple corrective actions outstanding, including host-country approval and prior-consideration clarification, which weakens confidence in the overall crediting case.

Transparency

The monitoring and crediting period are clearly identified, and the verifier is named as LGAI Technological Center, S.A. (Applus+). However, the extracted record does not state claimed emissions reductions or the usage monitoring method, which limits public traceability. The low extraction confidence also suggests at least one key source was difficult to read, reducing documentation clarity.

Claim Safety

This is an avoidance project with a project-specific baseline, but the baseline was not shown to have been recently reassessed. Leakage treatment is not cleanly documented: one part of the record says leakage justification was quantified, while another earlier document said it was not addressed. With no verified usage rates, no FNRB value, and no CORSIA or CCP status stated, over-crediting and double-claim risk remain only partially assessed.

Documentation

The record draws on eleven documents, which is a reasonable base, and the issuance report notes no material findings. Even so, extraction confidence is low, and several corrective actions remained open in the issuance record. The project dates are relatively old, and the documentation set does not provide several key quantitative fields needed for a stronger assessment.

Overall

The project scores in the middle range because it has a credible additionality signal and no reported reversals, but the evidence base is incomplete and somewhat inconsistent. I privileged the later issuance record dated 2017-10-13 over earlier documents when there was a conflict, because it is more recent and closer to issuance; that means I treated safeguards as mentioned and leakage as quantified, while still discounting confidence because the contradictions indicate reliability issues. The contradiction on safeguards and the contradiction on leakage treatment both reduce trust in the file, and the low extraction confidence further depresses the documentation and transparency assessment.

Audit Analysis

This wind project has some strengths: additionality was confirmed by the VVB, no reversal events were reported, and the issuance record shows no material findings. However, the documentation is incomplete in several important areas, with missing leakage details, no buffer pool information, and multiple corrective actions that point to unresolved quality issues.

Project Description

Mahalaxmi Commercial Services Private Limited proposed a 10.5 MW wind power project in Maharashtra, India. The project generates electricity using wind energy and supplies it to the MSEDCL grid, which is under the purview of NEWNE grid, and helps prevent the need for new power plants that produce emissions. The project was open for public comment, but no comments were received.

Red Flags

  • Several corrective actions were still required, including host-country approval, prior-consideration clarification, and billing/apportionment details.
  • Leakage treatment is inconsistent across documents, and key transparency fields such as claimed emissions reductions and usage monitoring are not stated.

Credit Vintages Exhausted

Issued Retired Available
2013
4,390 4,390 0
2014
13,786 13,786 0
2015
9,406 9,406 0
Total 27,582 27,582 0

Cosa migliorerebbe questo punteggio

  • Provide a complete, internally consistent leakage assessment and clearly state the quantified deduction in the final issuance package.
  • Publish the missing transparency items, including claimed emissions reductions, usage monitoring details, and explicit host-country approval and anti-double-counting evidence.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversals reported

Leakage

Leakage treatment inconsistent in records

Baseline

Project-specific baseline; reassessment not stated

Safeguards

Safeguards mentioned, but FPIC and grievance mechanism absen

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-18 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti