Grid connected electricity generation plant using natural gas at Jurong Island in Singapore
Developer: Pacific Light Power Pte. Ltd
Methodology: AM0029 (CDM)
#1577of 1699 in Industrial#6of 7 in Singapore#5077of 5269 in CDM (UNFCCC)#56of 57 in AM0029
Score from methodology v2.1 (analysis of 21 Sep 2026). Re-assessment under v2.2 pending.
Assessment
Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.
Findings
Risk Indicators
🔒
🔒
🔒
🔒
🔒
🔒
Score Breakdown
Score factors per dimension are a Premium feature — Unlock with Premium
Gates applied
The gates applied to this score are a Premium feature — Unlock with Premium
Detailed Analysis
The detailed per-dimension analysis is a Premium feature — Unlock with Premium
Evidence
Eligibility & market
Under decision 4/CMP.20 of the Parties to the Kyoto Protocol (FCCC/KP/CMP/2025/7/Add.1, paragraph 5), the submission of requests for issuance of new CERs was discontinued as of 30 June 2026; requests to transfer CERs to the Article 6.4 mechanism registry, cancellations and any other transactions in the CDM registry are discontinued as of 31 December 2026. The UNEP-CCC Article 6 Pipeline (checked 2 Nov 2026) lists a request to move this activity to the Article 6.4 mechanism and no approval of it; approvals were due by 30 June 2026 (decision 20/CMA.7, paragraph 25). This page keeps the project's record and our analysis.
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
No issuances recorded on the registry.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Records with the same name in other registries
Records in another registry with the same name, country and methodology. Each has its own credits, documents and score.
Similar projects
Same methodology or sector, the same registry first.
- 18 MW Natural Gas based community power plant and 2 MW Waste Heat Recovery systemCDM-1912
- Grid Connected Gas based Combined Cycle Power Project in Andhra PradeshCDM-8323
- 155 MW Gas based combined cycle power project at HaziraCDM-1300
- Beijing No.3 Thermal Power Plant Gas-Steam Combined Cycle Project Using Natural GasCDM-1373
- Grid connected electricity generation using natural gas by Lanco Kondapalli Power Private LimitedCDM-5554
- Combined cycle natural gas based grid connected power plant at Jegurupadu, IndiaCDM-5257
- 1147.5 MW Natural gas based grid connected Combined cycle power generation projectCDM-1116
- Guangzhou Zhujiang Power Plant Gas (LNG) Combined Cycle ProjectCDM-1828