Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Re-assessment pendingCDMWindIndiaRegistry: RegisteredAMS-I.D

Green Electricity Generation from Wind Power Project located in Coimbatore, India

Developer: Sheela Clinic

CDM-9700 ↗

#1257of 4739 in Renewable energy#693of 2758 in India#751of 5267 in CDM (UNFCCC)#411of 1917 in AMS-I.D

Score from methodology v2.1 (analysis of 21 Sep 2026). Re-assessment under v2.2 pending.

Assessment

CarbonMeld document-based assessment

01020304 Overall 6.1 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Re-assessment pending · v2.1

How this analysis was made

Our method
CarbonMeld methodology v2.1 · analysed on 21 Sep 2026 · 7/7 registry documents analyzed · re-assessment under v2.2 pending

Analysis

A CDM wind power project in Coimbatore, India with a VVB-confirmed investment additionality test and jurisdictional baseline. Three corrective action requests from the verification report (PDD compliance, emission factor calculation, and sensitivity analysis) introduce moderate data-quality concerns, and the grid emission factor dates to 2009. The project delivered roughly 77% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating no over-crediting risk.

Red Flags

3 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Gates applied

The gates applied to this score are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

On this page: the analysis of 21 Sep 2026, marked “Re-assessment pending”. Per-dimension scores, risk indicators, 3 red flags, score factors, detailed analysis, and 7 registry documents (7 analyzed).

€9+ VAT per month · card subscription, renews automatically until you cancel

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons (public-data comparison is free; fair use: 30 projects per day). Cancel any time from your account page. Crypto: $9 for one month, no automatic renewal.

Price + VAT · By subscribing or paying you accept the Terms of Use — the card subscription renews every month until you cancel; digital content, no refunds. How Premium works

Eligibility & market

Under decision 4/CMP.20 of the Parties to the Kyoto Protocol (FCCC/KP/CMP/2025/7/Add.1, paragraph 5), the submission of requests for issuance of new CERs was discontinued as of 30 June 2026; requests to transfer CERs to the Article 6.4 mechanism registry, cancellations and any other transactions in the CDM registry are discontinued as of 31 December 2026. The UNEP-CCC Article 6 Pipeline (checked 2 Nov 2026) lists a request to move this activity to the Article 6.4 mechanism and no approval of it; approvals were due by 30 June 2026 (decision 20/CMA.7, paragraph 25). This page keeps the project's record and our analysis.

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

    Covers: the project type, not a label on individual credits

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

No issuances recorded on the registry.

Methodology versions used

The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.

  1. 2013–2020AMS-I.D v17.0since replaced by v18.0

    monitoring report

    official page · verified on

  • AMS-I.D: Active (CDM / UNFCCC) · official page · verified on

A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.

Documents on the registry

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →

Similar projects

Same methodology or sector, the same registry first.