Capacity Upgrade of Gunung Salak Geothermal Power Plant Project, Indonesia
Developer: PT Indonesia Power
Assessment
Analysis queued
This project is in the analysis queue and has not been rated yet. Registry data, credit vintages and purchase availability below reflect the latest registry snapshot; the quality score will appear here once the analysis completes.
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
No CORSIA label on the registry
Not usable for airlines' CORSIA obligations.
Source: registry label · read on 1 Nov 2026
Covers: this project's credit records as read on the registry
Integrity label (ICVCM CCP)
Methodology not approved by ICVCMACM0002
The Integrity Council assessed this methodology as not meeting the Core Carbon Principles.
Source: ICVCM assessment · ICVCM table read on 4 Oct 2026
Covers: the methodology (every project using it), not this project's credits
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: methodology
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
No Article 6 authorization
No corresponding adjustment: the host country can also count this reduction towards its own target.
Source: registry label · read on 1 Nov 2026
Covers: this project's credit records as read on the registry
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Registry labels last checked:2026-11-01
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 281,802 | 281,479 | 323 | |
| 2009 | 118,459 | 118,459 | 0 | |
| 2010 | 98,510 | 98,510 | 0 | |
| 2011 | 137,084 | 136,917 | 167 | |
| 2012 | 132,695 | 132,687 | 8 | |
| 2013 | 87,300 | 85,869 | 1,431 | |
| 2014 | 124,544 | 124,222 | 322 | |
| 2015 | 150,586 | 150,586 | 0 | |
| 2016 | 122,665 | 121,398 | 1,267 | |
| 2017 | 123,740 | 110,805 | 12,935 | |
| 2018 | 129,921 | 129,921 | 0 | |
| 2019 | 104,440 | 104,440 | 0 | |
| Total | 1,611,746 | 1,595,293 | 16,453 |
Retired by
- AUDI AG125,000 t
- National Australia Bank Limited70,000 t
- NAB70,000 t
- WPP 2005 Limited20,000 t
- WPP20,000 t
- SEAT S.A11,200 t
- Oldendorff Carriers Uk Limited5,880 t
- AMP Limited5,585 t
- CILS Sherburn Limited, 72 Welbeck Street, london, England, W1G 0AY4,525 t
- Bentley Motors Ltd4,000 t
Organisations named as beneficiaries in the registry's public retirement records. (+46)
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- CGN Aletai Qinghe Phase I 20MWp Grid-connected PV Power Plant ProjectVCS-1247
- China Resources Huilai Xian¡¯an Wind Power ProjectVCS-793
- Torlar 14.834 MWe Hydroelectric power plantVCS-1331
- Yiyang Xiushan Hydropower Project, P.R. ChinaVCS-699
- 16.45 MW bundled grid connected renewable energy project in Tamil Nadu, India.VCS-678
- Foz Do Chapecó ProjectVCS-896
- Cermikler 25.00 MW Hydroelectric Power Plant ProjectVCS-1050
- Wind power project at Tamilnadu by Powerica LimitedVCS-700
