0.4 MW Ground Mounted Solar Power Project By M/s Rijul Dewan Solar Power Project
#634of 770 in Renewable energy#12of 13 in Himachal Pradesh India#259of 421 in Universal Carbon Registry (UCR)#327of 417 in AMS-I.D
Audit Analysis
A small 0.4 MW ground-mounted solar project in Himachal Pradesh registered under the UCR standard, with a jurisdictional baseline and a 0% leakage deduction deemed negligible. The available record consists solely of a Project Design Document; no verification report, monitoring report, or VVB identification was found, leaving additionality, ERR delivery, and safeguards largely unverified. The project type carries inherently low permanence risk, but the absence of any third-party verification or quantified emission figures makes independent assessment of claim safety difficult.
Red Flags
- No VVB name or verification report found in the available record; additionality verification by an independent body cannot be confirmed
- No ERR figures (claimed or verified) are available, preventing any assessment of over- or under-crediting
- Only a single PDD document is available; no monitoring report, verification report, or VVB report was extracted
- Crediting period of approximately 2.4 years (Aug 2019 – Dec 2021) is unusually short for a solar PV project and may indicate incomplete data extraction or an atypical project structure
- Grid emission factor of 0.9 tCO₂/MWh is sourced from 2014 data, which is over 8 years old at the time of the PDD (2022)
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Methodology requires it but no VVB verification found
Avoidance project, no reversal risk identified
0% deduction, justification is a single phrase
Jurisdictional but EF from 2014, no reassessment data
Mentioned in PDD but FPIC and grievance mechanism unconfirme
CORSIA and CCP status not stated in available record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →