10.5 MW wind power project in Ossiya, Rajasthan by Gujarat Fluorochemicals Limited (GFL)
#464of 1935 in Renewable energy#236of 975 in India#299of 1459 in CDM (UNFCCC)#351of 1287 in ACM0002
Audit Analysis
A 10.5 MW CDM wind project in Rajasthan with a standard jurisdictional grid baseline and VVB-verified investment additionality test. The project delivered roughly 85% of its pro-rata expected emissions reductions in the first monitoring period, with no reversal events. However, the validation process surfaced 28 material findings—including a significant reduction in monitoring parameters and benchmark calculation errors—and safeguards documentation (FPIC, grievance mechanism) is absent from the extracted record.
Red Flags
- Monitoring plan was reduced from 2 feeders (11 parameters) to 1 feeder (4 parameters) due to grid changes, raising questions about the robustness of ongoing MRV
- 28 material findings were raised during validation, including benchmark calculation errors (RoE, beta, risk-free rate) and a missing credible alternatives analysis, indicating a weak initial PDD
- The PDD is dated 2015-12-04, which is after both the validation report (2012-12-07) and the monitoring report (2014-09-12), suggesting a late revision that complicates the document timeline
- Additionality test type is inconsistent across documents: the validation report records an investment test while the PDD records a combined test
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 23,853 | 0 | 23,853 | |
| Total | 23,853 | 0 | 23,853 |
Risk Indicators
VVB-verified investment test
Avoidance project, no reversal events
Deemed negligible, reasonable for wind
Jurisdictional grid EF, standard for CDM wind
Mentioned but FPIC and grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.