10 MW solar power project by NKG Infrastructure Limited

CDM-7188 ↗

#183of 770 in Renewable energy#115of 387 in India#36of 213 in CDM (UNFCCC)#57of 417 in AMS-I.D

5.7/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A 10 MW solar PV project in India validated under CDM methodology AMS-I.D v18 with a jurisdictional baseline and VVB-confirmed combined additionality test. The project is fundamentally sound in design, but the available record is limited to the PDD and validation report with no monitoring data, and a significant discrepancy in the claimed emissions reduction figure between the two documents raises data-reliability concerns.

Red Flags

  • The PDD (Sep 2019) claims a total ERR of 98,758 tCO2e while the validation report (Oct 2019) states 14,108 tCO2e — a roughly 7-fold difference that likely reflects different time bases (7-year crediting period vs. annual) but is not explicitly reconciled in the extracted record.
  • No monitoring or verification report is present in the extracted record; the monitoring period is not stated, so actual delivery against the validated baseline cannot be assessed.
  • Six corrective action requests (CARs) were raised during validation, including use of an outdated methodology version and missing technical details, indicating initial PDD quality issues (all resolved before validation approval).

Credit Vintages

IssuedRetiredAvailable
2020
102,5330102,533
Total102,5330102,533

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversal risk

Leakage

Quantified, 0% reasonable for solar

Baseline

Jurisdictional, 2018 grid EF

Safeguards

Mentioned, FPIC/grievance not detailed

Double-claim

CORSIA and CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents