10 MW solar power project by NKG Infrastructure Limited
#183of 770 in Renewable energy#115of 387 in India#36of 213 in CDM (UNFCCC)#57of 417 in AMS-I.D
Audit Analysis
A 10 MW solar PV project in India validated under CDM methodology AMS-I.D v18 with a jurisdictional baseline and VVB-confirmed combined additionality test. The project is fundamentally sound in design, but the available record is limited to the PDD and validation report with no monitoring data, and a significant discrepancy in the claimed emissions reduction figure between the two documents raises data-reliability concerns.
Red Flags
- The PDD (Sep 2019) claims a total ERR of 98,758 tCO2e while the validation report (Oct 2019) states 14,108 tCO2e — a roughly 7-fold difference that likely reflects different time bases (7-year crediting period vs. annual) but is not explicitly reconciled in the extracted record.
- No monitoring or verification report is present in the extracted record; the monitoring period is not stated, so actual delivery against the validated baseline cannot be assessed.
- Six corrective action requests (CARs) were raised during validation, including use of an outdated methodology version and missing technical details, indicating initial PDD quality issues (all resolved before validation approval).
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 102,533 | 0 | 102,533 | |
| Total | 102,533 | 0 | 102,533 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
Quantified, 0% reasonable for solar
Jurisdictional, 2018 grid EF
Mentioned, FPIC/grievance not detailed
CORSIA and CCP status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →