12 MW Raura Hydro Project by DLI Power
#55of 387 in India#118of 629 in Verra (VCS)#31of 417 in AMS-I.D
Audit Analysis
The 12 MW Raura Hydro Project is a VCS-registered renewable energy project with a VVB-confirmed investment additionality test and no reversal events, but it is undermined by ten cross-document contradictions—particularly on baseline method, leakage justification, and ERR figures—that reduce confidence in the data record. The project delivered below its ex-ante estimate in the most recent monitoring period due to low water availability, which is a positive signal against over-crediting. Overall, the project is moderately sound but its documentation trail is inconsistent enough to warrant caution.
Red Flags
- Ten contradictions across documents, including baseline method ('project' in 2023 verification vs 'jurisdictional' in 2025 monitoring report) and leakage justification ('not_addressed' in 2024 vs 'deemed_negligible' in 2023), indicating inconsistent reporting over time
- ERR figures conflict within the same monitoring report (79,607 vs 45,575 tCO2e, both dated 2025-09-23), making it unclear which value represents the ex-ante estimate and which the verified figure
- Crediting period start date differs by six months between the validation report (2019-03-01) and the 2025 verification report (2019-09-09), creating ambiguity about the exact project timeline
- Grid emission factor of 0.92245 tCO2/MWh is from 2018 and no updated value or reassessment date is stated in the available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 6,825 | 782 | 6,043 | |
| 2020 | 39,821 | 32,646 | 7,175 | |
| 2021 | 38,464 | 35,000 | 3,464 | |
| 2022 | 32,128 | 31,678 | 450 | |
| 2023 | 34,893 | 25,089 | 9,804 | |
| Total | 152,131 | 125,195 | 26,936 |
Risk Indicators
VVB-confirmed investment test
Renewable energy, no reversal events
0% deduction, justification inconsistent
Method contradicted, EF from 2018
Present in recent reports, absent in 2022
CORSIA excluded, CCP not mentioned
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →