Skip to main content
VCSEnergy industries (renewable/non-renewable sources)India Registry: RegisteredAMS-I.D

12 MW Raura Hydro Project by DLI Power

VCS-1800 ↗

#55of 387 in India#118of 629 in Verra (VCS)#31of 417 in AMS-I.D

6.2/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
7.0
Documentation
5.0

Audit Analysis

The 12 MW Raura Hydro Project is a VCS-registered renewable energy project with a VVB-confirmed investment additionality test and no reversal events, but it is undermined by ten cross-document contradictions—particularly on baseline method, leakage justification, and ERR figures—that reduce confidence in the data record. The project delivered below its ex-ante estimate in the most recent monitoring period due to low water availability, which is a positive signal against over-crediting. Overall, the project is moderately sound but its documentation trail is inconsistent enough to warrant caution.

Red Flags

  • Ten contradictions across documents, including baseline method ('project' in 2023 verification vs 'jurisdictional' in 2025 monitoring report) and leakage justification ('not_addressed' in 2024 vs 'deemed_negligible' in 2023), indicating inconsistent reporting over time
  • ERR figures conflict within the same monitoring report (79,607 vs 45,575 tCO2e, both dated 2025-09-23), making it unclear which value represents the ex-ante estimate and which the verified figure
  • Crediting period start date differs by six months between the validation report (2019-03-01) and the 2025 verification report (2019-09-09), creating ambiguity about the exact project timeline
  • Grid emission factor of 0.92245 tCO2/MWh is from 2018 and no updated value or reassessment date is stated in the available documents

Credit Vintages

IssuedRetiredAvailable
2019
6,8257826,043
2020
39,82132,6467,175
2021
38,46435,0003,464
2022
32,12831,678450
2023
34,89325,0899,804
Total152,131125,19526,936

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Renewable energy, no reversal events

Leakage

0% deduction, justification inconsistent

Baseline

Method contradicted, EF from 2018

Safeguards

Present in recent reports, absent in 2022

Double-claim

CORSIA excluded, CCP not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-ID

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents