199.70 MW Wind Project in Maharashtra by BWDPL
#60of 770 in Renewable energy#32of 387 in India#77of 629 in Verra (VCS)#41of 383 in ACM0002
Audit Analysis
A 199.70 MW wind energy project in Maharashtra with a sound additionality assessment (investment test, VVB-verified) and an appropriate jurisdictional grid-emission-factor baseline. The project is an avoidance-type credit with minimal permanence risk, and the most recent monitoring period shows claimed and verified ERR figures matching exactly. However, the grid emission factor dates to 2014, several data fields show internal contradictions within the same verification report, and the overall documentation record carries medium extraction confidence.
Red Flags
- Grid emission factor of 0.977 tCO2/MWh is from 2014, making it approximately 10 years old at the time of the September 2024 verification report; no evidence of an updated grid EF was found in the extracted record.
- Eight contradictions were identified across documents, including four (FPIC, grievance mechanism, benefit-sharing, safeguards) showing conflicting true/false values within the same verification report dated 2024-09-21, suggesting data-extraction or internal-reporting inconsistencies.
- Leakage justification is recorded as 'not_addressed' in the 2024 verification report, contradicting the 2021 report's 'not_applicable' classification; while 0% leakage is technically appropriate for a grid-connected wind project, the lack of an explicit justification statement is a documentation gap.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 67,252 | 67,252 | 0 | |
| 2014 | 230,108 | 230,108 | 0 | |
| 2015 | 128,689 | 127,690 | 999 | |
| 2016 | 448,116 | 448,116 | 0 | |
| 2017 | 396,360 | 355,746 | 40,614 | |
| 2018 | 403,027 | 221,287 | 181,740 | |
| 2019 | 418,133 | 267,309 | 150,824 | |
| 2020 | 368,481 | 196,092 | 172,389 | |
| 2021 | 304,579 | 237,175 | 67,404 | |
| Total | 2,764,745 | 2,150,775 | 613,970 |
Risk Indicators
Investment test, VVB-verified
Avoidance project, no reversal risk
0% deduction, justification inconsistent across reports
Jurisdictional grid EF, but 2014 vintage
Mentioned but contradictory in same report
Not CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →