4×50 MW Dayingjiang- 3 Hydropower Project Phases 1&2
Score Breakdown
Integrity
verified Additionality was tested using an investment test and was later confirmed by the VVB in the validation report.
missing The monitoring report required corrections to project capacity, financial analysis, and project dates, and the record contains a contradiction with the PDD on whether additionality was accepted.
Transparency
verified The monitoring report provides a quantified monitoring period and exact claimed and verified emission reductions, which match at 3,614,268.
missing Public-facing clarity is weakened by the registry denial and by missing or inconsistent details on usage monitoring, baseline reassessment, and leakage quantification.
Claim Safety
verified The project is an avoidance project with no reversal events reported, so permanence risk is structurally lower than for removals.
missing Leakage is only described as negligible in the monitoring report, while the validation report reportedly quantified it, and the project is not CORSIA-eligible.
Documentation
verified Multiple official documents were used, including the PDD, validation report, monitoring report, and issuance-related material.
missing The monitoring report lists several corrective actions and the extraction record shows contradictions across documents, reducing documentation reliability.
Detailed Analysis
Integrity
The project has some positive integrity signals because the validation report confirms additionality through an investment test, and the monitoring report shows no reversal events for this hydropower avoidance activity. However, the monitoring report also required corrective actions on installed capacity, financial analysis, and project schedule, which suggests material documentation issues. The contradiction between the PDD and validation report on whether additionality was accepted further weakens confidence in the baseline and additionality narrative.
Transparency
Transparency is moderate at best. The monitoring report clearly states the monitoring period and reports identical claimed and verified reductions of 3,614,268, which is helpful. But key MRV details such as usage monitoring method, baseline reassessment timing, and leakage quantification are not stated in available documents, and the registry status being denied reduces public confidence in the record.
Claim Safety
Claim safety is limited by the project’s documentation quality and registry outcome. The project is not CORSIA-eligible, which reduces dual-market concern, but the leakage treatment is inconsistent because the monitoring report says leakage was deemed negligible while the validation report is described as having quantified leakage. Because the project is a hydropower avoidance project, permanence risk is lower, but the unresolved documentation issues still raise over-crediting concerns.
Documentation
Documentation breadth is decent because the extracted record includes the PDD, validation report, monitoring report, and issuance-related material, and extraction confidence is high. Even so, the monitoring report lists three corrective actions, and several safeguard-related items are contradicted across documents. The absence of a clear baseline reassessment and the inconsistent treatment of FPIC, grievance mechanisms, and benefit sharing reduce the overall documentation score.
Overall
I privileged the more recent monitoring report for operational details such as safeguards and leakage treatment, and the validation report for the additionality conclusion because it is the independent VVB assessment. That said, the registry’s verification approval request was denied, so I discounted the score for reliability and claim safety. The contradictions on grievance mechanisms, safeguards, FPIC, benefit sharing, leakage, and additionality are material and indicate that the project record is not fully dependable.
Audit Analysis
This is a hydropower avoidance project with VVB-verified additionality, but the record has important reliability and safeguard gaps. The project was denied verification approval at registry level, and the documents contain several contradictions on safeguards, leakage treatment, and additionality, which weakens confidence in the claimed reductions.
Project Description
The Dayingjiang-3 Hydropower Project Phases 1&2 in Yunnan Province, China, is a renewable energy project that generates electricity by utilizing the water resources of the Daying River. Four 50 MW hydro generation units are installed and the electricity generated is sold to the Dehong Power Grid and then fed to Yunnan Power Grid. The project achieves significant GHG emission reductions by avoiding 569,379 tonnes of CO2e per year, making it a valuable addition to the China Southern Power Grid.
Red Flags
- Registry status shows verification approval request denied, which is a major credibility concern.
- The documents conflict on safeguards, FPIC, benefit sharing, leakage treatment, and additionality, indicating inconsistent project records.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 269,393 | 269,393 | 0 | |
| 2008 | 609,708 | 609,708 | 0 | |
| 2011 | 1,699,042 | 1,690,830 | 8,212 | |
| Total | 2,578,143 | 2,569,931 | 8,212 |
Cosa migliorerebbe questo punteggio
- Provide a reconciled document set that resolves the contradictions on additionality, leakage, FPIC, grievance mechanisms, and benefit sharing.
- Publish a clear MRV annex with baseline reassessment, leakage calculation, and usage monitoring details, along with the registry decision rationale.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed but disputed
Avoidance project, no reversals reported
Negligible claim, inconsistent support
Project baseline, reassessment not stated
No safeguards documented
Not CORSIA-eligible; CCP not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →