Skip to main content
CDMWindIndiaACM0002

42.5 MW Wind Power Project by VRL Logistics Ltd in Karnataka State (India)

CDM-2265 ↗

#23of 1935 in Renewable energy#15of 975 in India#15of 1459 in CDM (UNFCCC)#14of 1287 in ACM0002

7.0/ 10
Integrity
7.5
Transparency
6.5
Claim Safety
7.0
Documentation
7.0

Audit Analysis

A standard CDM wind power project with a VVB-confirmed investment additionality test, jurisdictional grid baseline, and no permanence risk inherent to the technology. The project delivered approximately 90% of its lifetime claimed reductions, with all material findings (mostly minor PDD corrections and a meter calibration delay) resolved. Some eligibility and safeguards details remain unstated in the available record.

Red Flags

  • Original PDD contained a significant error in the transmission losses formula (115% instead of 15%), corrected during verification — indicates initial documentation quality issues
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unconfirmed
  • Grid emission factor is fixed at the 2007 registration value (0.93 tCO2/MWh); no updated or reassessed baseline figure is available in the record

Credit Vintages

IssuedRetiredAvailable
2011
65,655065,655
2012
133,3940133,394
2013
74,417074,417
2015
131,4500131,450
2017
57,889057,889
2018
63,807063,807
2019
59,556059,556
2022
63,787063,787
Total649,9550649,955

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

Deemed negligible, appropriate for wind

Baseline

Jurisdictional grid EF, standard CDM

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents