5.8 MW Wind Energy Generation by M/s Patspin India Limited.
#118of 770 in Renewable energy#64of 387 in India#16of 213 in CDM (UNFCCC)
Audit Analysis
A 5.8 MW CDM wind project in India with a confirmed investment-test additionality assessment by BVC Holding SAS and a reasonable pro-rata credit delivery of roughly 87% of the expected first-period reduction. However, several key MRV parameters (verified ERR, FNRB method, usage monitoring) are absent from the extracted record, and a contradiction in the baseline method description (project-specific vs. jurisdictional) introduces uncertainty about the robustness of the baseline. The project is an avoidance-type wind installation with no inherent reversal risk, and all eight validation findings were closed without outstanding corrective actions.
Red Flags
- Baseline method is described as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report — an unresolved inconsistency that could affect the validity of the grid emission factor application.
- Verified ERR for the monitoring period is not stated in the extracted record; only the claimed figure of 16,028 tCO2 is available, preventing independent verification of actual delivery.
- Grid emission factor of 0.93 tCO2/MWh is drawn from 2007 data with no documented reassessment or update mechanism noted in the available documents.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 16,049 | 0 | 16,049 | |
| Total | 16,049 | 0 | 16,049 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, quantified justification
Method contradiction; 2007 grid EF
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →