50.4 MW wind power project by EN Renewable Energy Pvt. Ltd
#207of 770 in Renewable energy#133of 387 in India#43of 213 in CDM (UNFCCC)#164of 383 in ACM0002
Audit Analysis
A 50.4 MW wind power project in India under CDM with an investment additionality test and a reputable VVB (TÜV SÜD), but the record is marred by three material administrative findings, three inter-document contradictions (leakage justification, ERR figures, and baseline method), and several key fields not stated in available documents. The project is inherently low-risk on permanence as an avoidance-type wind project, and the monitoring-period ERR of 216,117 tCO₂e represents roughly 75% of the pro-rata lifetime expectation, indicating conservative delivery. Overall a mid-range project with documentation quality concerns that temper confidence.
Red Flags
- Three material findings in the monitoring report: host country listed as Spain instead of India, methodology applicability criteria not aligned with version 20, and flow diagram misidentifying the grid as Southern Grid
- Contradiction on baseline method: the validation report (Sep 2020) states a jurisdictional baseline while the monitoring report (Feb 2021) describes a project-specific baseline
- Leakage justification is inconsistent across documents — the PDD (Nov 2020) deems leakage negligible while the monitoring report (Feb 2021) states it was quantified, yet the deduction is 0%
- Total verified ERR for the monitoring period is not stated in the extracted record; only the claimed figure of 216,117 tCO₂e is available
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 56,413 | 0 | 56,413 | |
| 2013 | 102,598 | 0 | 102,598 | |
| 2021 | 617,429 | 0 | 617,429 | |
| Total | 776,440 | 0 | 776,440 |
Risk Indicators
Investment test present; VVB confirmation not confirmed in r
Avoidance-type wind; no reversal risk or events reported
0% deduction; justification inconsistent across PDD and moni
Contradiction: jurisdictional (validation) vs project (monit
Safeguards mentioned; FPIC and grievance mechanism not confi
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →