50 MW SOLAR PROJECT BY AVAADA IN UP (INDIA)
#5of 770 in Renewable energy#4of 387 in India#11of 629 in Verra (VCS)#4of 383 in ACM0002
Audit Analysis
A 50 MW solar project in Uttar Pradesh, India, verified under VCS methodology ACM0002 with a VVB-confirmed investment additionality test, smart-meter monitoring, and no reversal events. The project is fundamentally sound, but a project-specific baseline, inconsistent leakage justification across documents, and several inter-document contradictions (baseline method, benefit sharing, crediting period) moderate confidence. CORSIA and CCP eligibility are not stated, leaving dual-channel risk unconfirmed.
Red Flags
- Leakage deduction of 0% is justified as 'deemed negligible' in the monitoring report but described as 'not addressed' in the verification report — the two 2024 documents disagree on whether leakage was even considered.
- Baseline method is stated as 'project-specific' in the verification report (Nov 2024) but 'jurisdictional' in the monitoring report (Nov 2024); the less robust project-specific baseline is privileged here, and no reassessment date is recorded.
- CORSIA eligibility and CCP status are not stated in any available document, so dual-channel or double-claiming risk cannot be excluded.
- The validation report (2020) lists 'common practice' as an additionality test alongside the investment test cited in the 2024 verification report, creating ambiguity about which test was actually relied upon.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 31,691 | 20,598 | 11,093 | |
| Total | 31,691 | 20,598 | 11,093 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
0% deduction, justification inconsistent
Project-specific, no reassessment date
FPIC, grievance mechanism, benefit sharing
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →