9 MW Renewable Energy Grid Connected Biomass Power Project
#47of 196 in Biomass#207of 387 in India#80of 213 in CDM (UNFCCC)#100of 417 in AMS-I.D
Audit Analysis
A 9 MW grid-connected biomass power project in India under CDM with a VVB-confirmed combined additionality test and a jurisdictional grid-emission-factor baseline (0.86 tCO₂/MWh). However, the verification report lists nine material findings on monitoring-plan adequacy and additionality evidence, the 0% leakage deduction rests solely on a 'deemed negligible' assertion without quantification, and no verified ERR figures are available in the extracted record. The baseline-method contradiction between the validation and monitoring reports further undermines data reliability.
Red Flags
- Nine material findings (CARs) in the verification report cover monitoring-plan gaps, missing PDD sections, and insufficient documentary evidence for additionality barriers, yet the corrective-actions list is empty
- Baseline method is recorded as 'jurisdictional' in the 2007 validation report but 'project' in the 2013 monitoring report — an unexplained discrepancy that affects baseline credibility
- Leakage deduction is 0% with only a 'deemed negligible' justification; no quantified assessment of feedstock diversion or displaced-use leakage is provided
- No verified ERR figures are present in the extracted record, making it impossible to confirm actual delivery against the 72,400 tCO₂ lifetime claim
- FPIC, grievance mechanism, and benefit-sharing details are not stated in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 12,009 | 0 | 12,009 | |
| 2014 | 72,400 | 0 | 72,400 | |
| Total | 84,409 | 0 | 84,409 |
Risk Indicators
VVB-confirmed combined test
No buffer pool or reversal data stated
0% deduction, 'deemed negligible' only
Jurisdictional EF but method contradicted
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →