9 MW Renewable Energy Grid Connected Biomass Power Project

CDM-1260 ↗

#47of 196 in Biomass#207of 387 in India#80of 213 in CDM (UNFCCC)#100of 417 in AMS-I.D

5.2/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A 9 MW grid-connected biomass power project in India under CDM with a VVB-confirmed combined additionality test and a jurisdictional grid-emission-factor baseline (0.86 tCO₂/MWh). However, the verification report lists nine material findings on monitoring-plan adequacy and additionality evidence, the 0% leakage deduction rests solely on a 'deemed negligible' assertion without quantification, and no verified ERR figures are available in the extracted record. The baseline-method contradiction between the validation and monitoring reports further undermines data reliability.

Red Flags

  • Nine material findings (CARs) in the verification report cover monitoring-plan gaps, missing PDD sections, and insufficient documentary evidence for additionality barriers, yet the corrective-actions list is empty
  • Baseline method is recorded as 'jurisdictional' in the 2007 validation report but 'project' in the 2013 monitoring report — an unexplained discrepancy that affects baseline credibility
  • Leakage deduction is 0% with only a 'deemed negligible' justification; no quantified assessment of feedstock diversion or displaced-use leakage is provided
  • No verified ERR figures are present in the extracted record, making it impossible to confirm actual delivery against the 72,400 tCO₂ lifetime claim
  • FPIC, grievance mechanism, and benefit-sharing details are not stated in any available document

Credit Vintages

IssuedRetiredAvailable
2013
12,009012,009
2014
72,400072,400
Total84,409084,409

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool or reversal data stated

Leakage

0% deduction, 'deemed negligible' only

Baseline

Jurisdictional EF but method contradicted

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents