ArBolivia- Phase II
Score Breakdown
Integrity
verified The PDD states a deemed-negligible leakage approach and includes benefit-sharing and safeguard language.
missing Additionality is not documented in the extracted record, and reversal risk is not addressed beyond a generic statement that reversals are not addressed.
Transparency
verified The project identifies the methodology as AR-AMS0001 version 05 and the document date is available.
missing No monitoring period, VVB name, claimed versus verified ER figures, or usage monitoring details are stated in the available documents.
Claim Safety
verified The project is an afforestation/reforestation activity, which generally lowers some over-crediting concerns relative to avoidance projects.
missing Baseline treatment, FNRB, and usage-rate assumptions are not stated, and leakage is only described as negligible without quantified support.
Documentation
verified The record includes a dated PDD and notes FPIC, safeguards, grievance mechanism, and benefit-sharing.
missing Only one document was used, and many core fields are not stated in the extracted record, limiting documentary completeness.
Detailed Analysis
Integrity
The available PDD mentions a deemed-negligible leakage approach and includes benefit-sharing, FPIC, and grievance mechanism language, which is directionally positive. However, additionality is not confirmed by a VVB in the extracted record, and the baseline method, buffer pool treatment, and reversal handling are not stated, which weakens confidence in permanence and baseline robustness.
Transparency
Transparency is weak because the extracted record contains only the PDD and does not state the monitoring period, VVB name, or any verified versus claimed emission reduction figures. The methodology and version are identified, but the absence of monitoring detail and registry completeness information leaves major gaps in public MRV visibility.
Claim Safety
Claim safety is limited by missing evidence on the baseline, FNRB, and usage-rate assumptions, all of which are important for assessing over-crediting risk in ARR projects. The PDD’s statement that leakage is deemed negligible helps somewhat, but without quantified leakage treatment or verification evidence, the claim remains only moderately safe.
Documentation
Documentation quality is modest at best: there is a dated PDD, but only one document was used and many key fields are not stated in the extracted record. The extraction confidence is medium rather than low, which avoids a harsher penalty, but the overall documentary basis is still incomplete for a robust assessment.
Overall
The project cannot be scored highly because the extracted record lacks several core elements needed to verify credit quality, especially additionality, baseline validity, monitoring, and permanence treatment. There are no explicit contradictions to resolve in the available record, so the assessment is driven mainly by evidence gaps rather than conflicting statements. Given the limited documentation and missing quantitative MRV details, the project remains a low-confidence crediting case.
Audit Analysis
The project has some basic safeguards on paper, including FPIC, a grievance mechanism, and benefit-sharing, but the extracted record is too thin to support strong confidence in credit quality. Key elements for integrity and transparency, such as additionality confirmation, baseline method, monitoring results, and buffer treatment, are not stated in the available document.
Project Description
Developer: The Cochabamba Project Type: A/R Size: Micro scale Methodology: Afforestation/Reforestation GHG Emissions Reduction & Sequestration Methodology Crediting period: 2007-01-01 → 2056-01-01 Estimated annual credits: 4000 tCO2e SDGs: Goal 13: Climate Action, Goal 15: Life On Land, Goal 12: Responsible Production and Consumption
Red Flags
- No baseline method, additionality test, or VVB confirmation is stated in the available PDD extract.
- Leakage is described as negligible, but no quantified deduction, monitoring evidence, or supporting justification is provided.
- Buffer pool size not disclosed in available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 10 | 10 | 0 | |
| 2009 | 250 | 250 | 0 | |
| 2010 | 652 | 652 | 0 | |
| 2011 | 25,566 | 13,172 | 12,394 | |
| 2012 | 39,048 | 24,076 | 14,972 | |
| 2013 | 47,828 | 25,183 | 22,645 | |
| 2014 | 55,109 | 28,515 | 26,594 | |
| 2015 | 54,462 | 28,206 | 26,256 | |
| 2016 | 57,528 | 31,379 | 26,149 | |
| 2017 | 32,355 | 31,817 | 538 | |
| 2018 | 32,211 | 32,211 | 0 | |
| 2019 | 36,926 | 0 | 36,926 | |
| 2020 | 33,311 | 0 | 33,311 | |
| 2021 | 27,904 | 0 | 27,904 | |
| 2022 | 21,393 | 0 | 21,393 | |
| 2023 | 16,587 | 0 | 16,587 | |
| 2024 | 17,756 | 0 | 17,756 | |
| 2025 | 8,555 | 0 | 8,555 | |
| 2026 | 6,613 | 0 | 6,613 | |
| 2027 | 5,009 | 0 | 5,009 | |
| 2028 | 2,699 | 0 | 2,699 | |
| 2029 | 1,035 | 0 | 1,035 | |
| 2030 | 292 | 0 | 292 | |
| 2031 | 147 | 0 | 147 | |
| 2032 | 60 | 0 | 60 | |
| Total | 523,306 | 215,471 | 307,835 |
Cosa migliorerebbe questo punteggio
- Provide the verification report and monitoring report showing VVB-confirmed additionality, verified ERs, and the monitoring period.
- Disclose the baseline method, buffer pool or reversal treatment, quantified leakage assessment, and registry/eligibility status.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
No additionality evidence stated
Reversal treatment not addressed
Negligible leakage not quantified
Baseline method not stated
FPIC and grievance mechanism present
Registry/eligibility status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →