BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project
Score Breakdown
Integrity
verified Additionality was tested using an investment test and was confirmed by the VVB in the monitoring report.
missing Leakage is marked as not addressed in the monitoring report, while the contradiction log says the validation report quantified it.
Transparency
verified The monitoring report provides a clear monitoring period, total claimed and verified ERs match at 67,780, and the VVB is identified as Rina.
missing Usage monitoring is not stated, and the record does not show a grid emission factor year or a baseline reassessment date.
Claim Safety
verified Claimed and verified emission reductions are identical at 67,780, which reduces immediate over-issuance concern.
missing Leakage justification is weak, and the project is not CORSIA-eligible while CCP status is not stated.
Documentation
verified Multiple evidence documents were used, including validation, monitoring, PDD, and issuance records, with high extraction confidence.
missing The record still leaves several fields unstated, including usage monitoring and buffer pool coverage, and the contradiction log shows unresolved document inconsistencies.
Detailed Analysis
Integrity
The monitoring report states that additionality was established through an investment test and that the VVB, Rina, confirmed it. Integrity is helped by the statement that no reversal events were reported, but the absence of a buffer pool value and the lack of a clear leakage treatment weaken the overall robustness. The project uses a project baseline, but the baseline was not shown to have been recently reassessed.
Transparency
Transparency is moderate because the monitoring report gives a defined monitoring period and shows total claimed and verified reductions both at 67,780. However, usage monitoring is not stated in the extracted record, and the grid emission factor year is missing. The documentation is also less complete because the baseline reassessment date is not found in available documents.
Claim Safety
Claim safety is constrained by the weak leakage treatment: the monitoring report says leakage is not addressed, even though the contradiction log says the validation report quantified it. The project is not CORSIA-eligible, which lowers dual-market claim risk, but CCP status is not stated. Matching claimed and verified ER totals is positive, yet it does not fully offset the uncertainty around leakage and safeguards.
Documentation
Documentation quality is fair because multiple official documents were used and extraction confidence is high. The record includes validation, monitoring, PDD, and issuance materials, and there were no material findings or corrective actions required in the monitoring report. Still, several important items are not stated, including buffer pool coverage, usage monitoring, and baseline reassessment timing.
Overall
The project scores in the middle range because it has a VVB-confirmed additionality test, no reported reversals, and matching claimed versus verified issuance figures, but it also has meaningful evidence gaps. I privileged the monitoring report for leakage, safeguards, and crediting-period information because it is the more recent document, while noting that the contradiction log says the validation report differs on those points; this lowers reliability and the score. The crediting-period contradiction was resolved in favor of the monitoring report as the later source, but the inconsistency still warrants a downward adjustment.
Audit Analysis
This is a registered VCS waste-heat recovery project with VVB-confirmed investment-test additionality and no reported reversals, which supports moderate integrity. However, leakage treatment is weakly justified, usage monitoring is not stated, and there are document contradictions on leakage, safeguards, and the crediting period that reduce confidence in the claim.
Project Description
Proponent: Batısoke Soke Çimento San. T.A.S. Protocol categories: Energy industries (renewable/non-renewable sources); Manufacturing industries Protocols: ACM0012 Estimated annual GHG reductions: 16993 tCO2e Region: Asia Registration date: 2020-06-04
Red Flags
- Leakage is recorded as not addressed in the monitoring report, even though the validation report reportedly quantified it.
- The project is not CORSIA-eligible, but CCP status is not stated and the record contains contradictions on safeguards and crediting period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 4,292 | 0 | 4,292 | |
| 2014 | 12,387 | 0 | 12,387 | |
| 2015 | 13,441 | 0 | 13,441 | |
| 2016 | 12,051 | 0 | 12,051 | |
| 2017 | 9,149 | 0 | 9,149 | |
| 2018 | 10,619 | 0 | 10,619 | |
| 2019 | 5,841 | 0 | 5,841 | |
| Total | 67,780 | 0 | 67,780 |
Cosa migliorerebbe questo punteggio
- Provide a clear, consistent leakage assessment across validation and monitoring documents, including the basis for any deduction.
- Disclose usage monitoring details, buffer pool treatment, and a reconciled explanation of the crediting-period and safeguards contradictions.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversals reported
Leakage treatment inconsistent
Project baseline, reassessment missing
Partial safeguards evidence
Not CORSIA-eligible; CCP not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →