Bethlehem Hydroelectric project
#123of 770 in Renewable energy#3of 12 in South Africa#21of 213 in CDM (UNFCCC)#38of 417 in AMS-I.D
Audit Analysis
The Bethlehem Hydroelectric project is a small-scale (2.4+3.4 MW) CDM hydro project in South Africa with a VVB-confirmed barrier additionality test and an appropriate grid-based baseline. However, the verification process surfaced ten material findings—including a ~25% overstatement of design capacity and inclusion of non-functional diesel generators in the monitoring plan—indicating meaningful data-integrity issues that were corrected but erode confidence in the original PDD. The project delivered approximately 115% of the pro-rata PDD expectation for the elapsed monitoring period, with no evidence of over-crediting.
Red Flags
- Design capacity was initially overstated (3+4 MW vs. corrected 2.4+3.4 MW) due to a power-factor calculation error, inflating the original PDD ERR estimate
- Non-functional backup diesel generators were included in the project sites and monitoring plan before being removed during verification
- Baseline method is described inconsistently across documents: the validation report (2016) calls it jurisdictional while the monitoring report (2020) labels it project-specific
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified
- Grid emission factor is from 2013 and no updated value is referenced in the monitoring report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 93,900 | 0 | 93,900 | |
| 2017 | 111,491 | 0 | 111,491 | |
| 2022 | 161,346 | 0 | 161,346 | |
| Total | 366,737 | 0 | 366,737 |
Risk Indicators
VVB-confirmed barrier test
No buffer pool stated; low reversal risk for hydro
0% quantified, appropriate for small hydro
Grid-based but method label inconsistent across docs; EF fro
Mentioned with benefit sharing; FPIC and grievance mechanism
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →