BIM Solar Farm

GS-1954 ↗ · current registry ID: GS7525

#137of 770 in Renewable energy#3of 25 in Vietnam#55of 426 in Gold Standard (GS)#98of 383 in ACM0002

6.0/ 10
Integrity
6.2
Transparency
5.8
Claim Safety
6.3
Documentation
5.2

Audit Analysis

The BIM Solar Farm is a Gold Standard solar thermal electricity project in Vietnam with a VVB-confirmed combined additionality test and consistent ERR delivery relative to the pro-rata expectation. However, eight contradictions across documents — including conflicting baseline methods, inconsistent FPIC status, and a 0% leakage deduction with weak justification — introduce meaningful uncertainty. The low extraction confidence and several unquantified parameters (FNRB, usage rates, buffer pool) limit the depth of assurance available.

Red Flags

  • Baseline method is stated as 'project-specific' in the verification report but 'jurisdictional' in the monitoring report (both 2025), creating ambiguity about the actual baseline approach
  • Leakage deduction is 0% with the verification report recording the justification as 'not addressed' while the monitoring report says 'deemed negligible' — no explicit quantitative or qualitative leakage analysis is documented
  • FPIC status is contradictory: the 2020 validation report confirms FPIC was conducted, but the 2023 PDD states it was not, leaving the true status unresolved
  • Min extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of the extracted record
  • No buffer pool percentage is stated in any available document, and the verification report does not address reversal risk explicitly

Credit Vintages

IssuedRetiredAvailable
2019
263,470263,4700
2020
442,269442,2690
2021
508,246234,846273,400
2022
521,9260521,926
2023
78,27110,00068,271
Total1,814,182950,585863,597

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal events

Leakage

0% deduction, justification inconsistent

Baseline

Project-specific, contradicted by monitoring report

Safeguards

FPIC contradicted, grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents