42 MW Amasya Wind Power Project

GS-66 ↗ · current registry ID: GS1091

#77of 770 in Renewable energy#19of 121 in Turkey#28of 426 in Gold Standard (GS)#53of 383 in ACM0002

6.3/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
7.0
Documentation
5.5

Audit Analysis

The 42 MW Amasya Wind Power Project is a well-designed Gold Standard wind project with a VVB-confirmed investment additionality test, a jurisdictional baseline reassessed in 2025, and conservative delivery (actual reductions below PDD estimates). However, the project carries a significant number of material findings, two open Findings of Action Required (crediting period correction in the GS registry and waste oil record verification), and a low extraction confidence rating that limits full assurance on documentation completeness.

Red Flags

  • FAR #1 (crediting period correction in GS registry) remains open across multiple verification cycles, indicating a persistent registry data integrity issue
  • FAR #2 (waste oil transfer and disposal records) remains open, creating an unresolved environmental compliance gap
  • Internal inconsistency in the 2025 verification report: actual reductions of 203,742 tCO2e are described as '22.4% lower' than the 217,196 tCO2e estimate, but the arithmetic difference is only ~6.2%
  • Crediting period contradiction between the 2025 verification report (2018–2025) and the 2025 validation report (2025–2032) has not been resolved in the GS registry
  • Minimum extraction confidence rated 'low', meaning at least one key document was poorly readable, reducing assurance on the completeness of the evidence base

Credit Vintages

IssuedRetiredAvailable
2018
76,20276,2020
2019
78,02465,52412,500
2020
74,62274,6220
2021
84,025084,025
2022
84,516084,516
2023
81,879081,879
2024
37,347037,347
Total516,615216,348300,267

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversals reported

Leakage

0% deemed negligible, appropriate for wind

Baseline

Jurisdictional, reassessed 2025

Safeguards

FPIC and grievance documented, but open FAR on waste records

Double-claim

CCP and CORSIA status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents