Biodiesel Project by Rajputana Biodiesel Private Limited
#351of 387 in India#584of 629 in Verra (VCS)#14of 23 in AMS-II.I
Audit Analysis
This VCS biodiesel project (AMS-III.AK.) in India is registered with RINA as VVB, but the verification process surfaced 19 material findings and 20 corrective actions, indicating significant quality-control weaknesses. The project delivered only about 7% of the pro-rata emissions-reduction expectation for the elapsed monitoring period relative to the PDD's lifetime claim, raising serious over-crediting concerns. FPIC was not conducted, no buffer pool is documented, and reversal risk was not addressed, leaving integrity and permanence protections thin.
Red Flags
- 19 material findings in the verification report, including methodology deviations, missing QA/QC procedures, and inconsistent GHG calculation parameters, all requiring corrective action before registration
- Verified ERR of 22,643 tCO2e for the 22-month monitoring period is only ~6.8% of the pro-rata expectation (~330,700 tCO2e) derived from the PDD's lifetime claim of 1,265,587 tCO2e over 7 years
- FPIC was not conducted (per the most recent verification report, April 2025), and benefit-sharing arrangements are not described
- No buffer pool percentage is documented and reversal events are explicitly 'not addressed' in the available records
- Multiple contradictions between the 2024 and 2025 verification reports on FPIC, grievance mechanism, safeguards, and benefit-sharing status
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 116 | 0 | 116 | |
| 2021 | 4,072 | 0 | 4,072 | |
| 2022 | 2,933 | 2,280 | 653 | |
| Total | 7,121 | 2,280 | 4,841 |
Risk Indicators
VVB-confirmed investment test
No buffer pool; reversal not addressed
0% deduction with 'quantified' justification
Project-specific; no reassessment date
Grievance present; FPIC not conducted
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →