GENNEIA SOLAR PROJECTS IN ARGENTINA

VCS-1996 ↗

#198of 770 in Renewable energy#1of 6 in Argentina#226of 629 in Verra (VCS)#157of 383 in ACM0002

5.7/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.0
Documentation
5.0

Audit Analysis

A registered VCS solar project in Argentina using the well-established ACM0002 methodology, with VVB-confirmed additionality and no material findings. However, six contradictions across documents—including conflicting baseline methods, inconsistent leakage justifications, and a discrepancy in the additionality test type—undermine confidence in the data record. The low extraction confidence and an 'unknown' document type further weaken the evidentiary base.

Red Flags

  • Baseline method is described as 'project' in the 2025 verification report but 'jurisdictional' in the 2025 monitoring report — a fundamental methodological inconsistency that affects the validity of the credit calculation.
  • Leakage justification is 'not addressed' in the October 2025 verification report but 'deemed negligible' in the August 2024 verification report, with a 0% deduction in both cases and no quantified analysis.
  • Additionality test type is recorded as 'investment' in the 2024 verification report but 'combined' in the 2019 PDD, creating ambiguity about which test was actually applied and verified.
  • Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable, which limits the reliability of the extracted data.

Credit Vintages

IssuedRetiredAvailable
2018
4,7974,7970
2019
86,44486,4440
2020
94,00394,0030
2021
91,40734,78456,623
2022
83,9101283,898
2023
10,0007089,292
Total370,561220,748149,813

Risk Indicators

Additionality

VVB-confirmed but test type contradicted across documents

Permanence

Renewable energy; no reversal events; low inherent risk

Leakage

0% deduction with inconsistent and insufficient justificatio

Baseline

Method contradicted (project vs jurisdictional); grid EF fro

Safeguards

FPIC conducted; grievance mechanism present; benefit sharing

Double-claim

CORSIA and CCP status not stated; dual-channel risk unconfir

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents