Biomass based power generation project in Maharashtra, India
#72of 352 in Biomass#468of 975 in India#655of 1459 in CDM (UNFCCC)#304of 806 in AMS-I.D
Audit Analysis
A CDM biomass power-generation project in Maharashtra with VVB-confirmed additionality and a reasonable leakage justification, but undermined by a baseline-method contradiction across monitoring reports, a grid emission factor frozen at a 2008 value, and verified emissions reductions that cover only about one-third of the pro-rata expectation for the elapsed crediting period. Feedstock sustainability and carbon-content data are absent from the extracted record, and a corrective action was required to add missing specific-fuel-consumption data to the PDD.
Red Flags
- Verified ERR of 44,626 for the 2018–2020 monitoring period is only ~33% of the pro-rata expectation (~136,857) derived from the PDD's lifetime claim of 497,660 over the 10-year crediting period, indicating significant under-delivery.
- Baseline method is described as 'project' in the 2021 monitoring report but 'jurisdictional' in the 2012 monitoring report — an unresolved inconsistency that undermines confidence in the baseline calculation.
- Grid emission factor of 0.805 tCO₂/MWh is anchored to 2008 data; no updated or sensitivity analysis is found in the extracted documents.
- Feedstock sustainability and carbon-content testing are not stated in any available document, leaving the renewable-biomass claim for bamboo dust and D-cake unverified.
- A corrective action was required to update the PDD with specific fuel consumption values for bamboo dust and D-cake, indicating the original project design document was incomplete.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 10,346 | 0 | 10,346 | |
| 2015 | 186,093 | 0 | 186,093 | |
| 2016 | 34,331 | 0 | 34,331 | |
| 2017 | 36,024 | 0 | 36,024 | |
| 2019 | 31,239 | 0 | 31,239 | |
| 2022 | 54,113 | 0 | 54,113 | |
| Total | 352,146 | 0 | 352,146 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal events
0% deemed negligible, justified
Method contradicts across reports; grid EF from 2008
Safeguards mentioned but FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.