Biomass based power project in Punjab, India
#211of 352 in Biomass#834of 975 in India#1277of 1459 in CDM (UNFCCC)#507of 806 in AMS-I.D
Audit Analysis
A CDM biomass power project in Punjab, India with VVB-confirmed additionality but significant methodological concerns: seven material findings in the monitoring report, a 7-fold discrepancy between the ex-ante and verified emission reduction figures on a pro-rata basis, and contradictory baseline and leakage characterisations across documents. The project's credit claims carry elevated over-crediting risk until these discrepancies are resolved.
Red Flags
- Seven material findings (CARs) in the 2022 monitoring report, including missing baseline validity demonstration, emissions formulas inconsistent with the methodology, and missing JMRs/logbooks
- Verified ERR of 171,019 tCO2e for the 3.5-year monitoring period is approximately 7× the pro-rata expectation of ~23,911 tCO2e derived from the validation report's ex-ante estimate of 47,821 tCO2e over the 7-year crediting period
- Baseline method is contradictory: the validation report (2020) describes a jurisdictional baseline while the monitoring report (2022) describes a project-specific baseline
- 0% leakage deduction is justified as 'quantified' in the monitoring report but 'deemed negligible' in the validation report, with no supporting calculation found in the extracted record
- Feedstock sustainability, carbon content testing, and usage monitoring method are all absent from the available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 33,581 | 0 | 33,581 | |
| 2022 | 188,250 | 0 | 188,250 | |
| Total | 221,831 | 0 | 221,831 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, contradictory justification
Project-specific, method contradictory across docs
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →