Skip to main content
GSEnergy Efficiency - DomesticSouth AfricaGeneral Methodologyv2.0

Brickstar Wood Stove - Mahlaba Area

GS-802 ↗ · current registry ID: GS4536

#92of 202 in Industrial#6of 12 in South Africa#236of 426 in Gold Standard (GS)

5.1/ 10
Integrity
4.8
Transparency
5.5
Claim Safety
4.5
Documentation
6.0

Audit Analysis

The Brickstar wood stove project in South Africa is a Gold Standard energy-efficiency project with a verified monitoring period (2019–2020) showing delivery of only ~46% of the pro-rata ex-ante expectation. Material findings in the verification report flag a usage rate of 37% versus 70% assumed and a lower-than-expected wood savings per cooking event, yet no corrective actions were mandated. The project's fundamental additionality logic (investment test) is present but its robustness is weakened by the unaddressed permanence question and the absence of a confirmed VVB sign-off on additionality in the extracted record.

Red Flags

  • Verified usage rate (37%) is less than half the ex-ante assumption (70%), and the verification report lists this as a material finding without requiring corrective action.
  • The new stove's wood savings per cooking event (3.3 kg) is lower than the baseline open-fire KPT (4.1 kg), undermining the ex-ante savings assumption; no corrective action was triggered.
  • Permanence / reversal risk is explicitly not addressed in the monitoring record and no buffer pool percentage is stated.
  • Crediting-period end date is missing in the verification report (stated as open-ended), creating ambiguity about the project's temporal scope.

Credit Vintages

IssuedRetiredAvailable
2017
4194190
2018
1,6261,519107
2019
1,2651,2650
2020
1,8461,451395
Total5,1564,654502

Risk Indicators

Additionality

Investment test present; VVB sign-off not confirmed in recor

Permanence

Not addressed; no buffer pool stated

Leakage

0% deduction with quantified justification

Baseline

Project-specific; KPT finding below baseline assumption

Safeguards

Grievance mechanism and benefit sharing present; FPIC not co

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents