BT2 Windfarm
GS-3212 ↗ · current registry ID: GS11223
#15of 25 in Vietnam#232of 426 in Gold Standard (GS)#252of 383 in ACM0002
Audit Analysis
The BT2 Windfarm is a Gold Standard wind energy project in Vietnam that displaces grid electricity, with additionality confirmed by the VVB via an investment test and a jurisdictional baseline. However, five material findings (methodology version errors, meter calibration discrepancies, and an emission factor mismatch) along with five required corrective actions and five cross-document contradictions significantly undermine confidence in the data quality. The project delivered approximately 91% of its pro-rata expected emissions reductions for the elapsed monitoring period, which is reasonable but the documentation gaps and low extraction confidence limit overall assurance.
Red Flags
- Five material findings in the verification report, including a methodology version mismatch (20.0 vs 21), a meter calibration serial number discrepancy, and a combined margin emission factor value in the MR table that did not align with the PDD
- Five cross-document contradictions spanning FPIC status, additionality test type, baseline method, leakage treatment, and ERR figures, indicating inconsistent project documentation
- Low extraction confidence across the document set, meaning at least one key document was poorly readable and data may be incomplete
- Buffer pool percentage not stated in any available document, leaving permanence risk unquantified
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 51,033 | 0 | 51,033 | |
| 2022 | 183,968 | 0 | 183,968 | |
| 2023 | 199,524 | 0 | 199,524 | |
| 2024 | 14,213 | 0 | 14,213 | |
| Total | 448,738 | 0 | 448,738 |
Risk Indicators
VVB-confirmed investment test
Avoidance project but buffer pool not stated
0% with negligible justification (appropriate for wind)
Jurisdictional per VR but contradicted by validation report
FPIC and grievance present but FPIC status contradicted acro
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →