Bundled Rooftop Solar Power Project by SJLT group
#83of 770 in Renewable energy#47of 387 in India#102of 629 in Verra (VCS)#8of 26 in AMS-I.F
Audit Analysis
A VCS-registered bundled rooftop solar project in India with a VVB-confirmed investment additionality test and a jurisdictional baseline, presenting a fundamentally sound renewable-energy credit. However, four cross-document contradictions (FPIC, baseline method, benefit sharing, crediting period) and the absence of any monitoring-period data or CORSIA/CCP status create meaningful transparency and data-reliability gaps that temper an otherwise low-risk project profile.
Red Flags
- FPIC status directly contradicts between the PDD (conducted) and the validation report (not conducted); the validation report is privileged but the absence of FPIC documentation is a safeguards gap
- Crediting period differs between the PDD (2023-11-30 to 2030-11-29) and the validation report (2023-09-25 to 2030-09-24), creating ambiguity about the exact eligibility window
- A Forward Action Request was raised regarding the commissioning certificate for the 0.5 MW unit, indicating a potential gap in operational readiness at validation
- No monitoring-period data, usage-rate verification, or CORSIA/CCP eligibility status is available in the extracted record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Not applicable – renewable energy
Deemed negligible, appropriate for rooftop solar
Jurisdictional but contradicted by PDD
Grievance mechanism present; FPIC not conducted per validati
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →