Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Thailand Registry: RegisteredGeneral Methodologyv2.0

FST SMALL-SCALE SOLAR POWER PLANT IN KAMPHAENG PHET, THAILAND

VCS-4600 ↗

#36of 770 in Renewable energy#1of 22 in Thailand#46of 629 in Verra (VCS)

6.7/ 10
Integrity
6.5
Transparency
7.0
Claim Safety
6.5
Documentation
7.0

Audit Analysis

A small-scale solar power plant in Thailand with VVB-confirmed additionality, smart-meter monitoring, and no material findings. The project is inherently low-risk as an avoidance-type renewable energy credit, but the verification report notes leakage was not properly addressed and the baseline is project-specific rather than jurisdictional. Overall a solid, low-complexity project with minor documentation gaps.

Red Flags

  • Verification report states leakage was 'not addressed' while the monitoring report claims it was 'deemed negligible' — the higher-priority verification report's assessment prevails, leaving the 0% leakage deduction without a documented justification
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2023
6,33506,335
2024
11,088011,088
Total17,423017,423

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification not addressed

Baseline

Project-specific, not jurisdictional

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents