Distributed Renewable Energy Program for People and Planet
#324of 770 in Renewable energy#211of 387 in India#366of 629 in Verra (VCS)#10of 26 in AMS-I.F
Audit Analysis
A small-scale distributed renewable energy project in India under the well-established AMS-I.F. methodology, with VVB-confirmed additionality and no inherent permanence risk. However, seven material findings (four requiring corrective action), a project-specific baseline with no documented reassessment, and the absence of any monitoring report for a project running since mid-2021 significantly limit confidence in the claims. The low extraction confidence and a grid emission factor discrepancy between documents further erode assurance.
Red Flags
- Seven material findings reported in the validation report, including four corrective actions (missing GPS coordinates, missing ownership documents, project start date error, and a requirement to demonstrate the project was not implemented to generate GHG for subsequent reduction)
- No monitoring report found in the extracted record despite the project crediting period beginning in June 2021 and the validation report being dated December 2024
- Grid emission factor contradiction: 0.931 tCO₂/MWh (validation report, 2022) versus 2.4 from an unidentified document of unknown date
- Low extraction confidence across the document set, indicating at least one key document was poorly readable
- Crediting period dates differ between the PDD (2021-01-01 to 2030-12-31) and the validation report (2021-06-23 to 2031-06-22)
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
Avoidance project, no reversal risk
0% deemed negligible, no quantified analysis
Project-specific, no reassessment date recorded
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →