Skip to main content
VCSEnergy industries (renewable/non-renewable sources)India Registry: RegisteredAMS-I.F

Grouped rooftop solar power project by SAEL Limited

VCS-2993 ↗

#327of 770 in Renewable energy#215of 387 in India#372of 629 in Verra (VCS)#11of 26 in AMS-I.F

5.2/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A registered VCS rooftop solar project in India with a confirmed combined additionality test and jurisdictional baseline, but the verification report surfaced 11 corrective actions including non-reproducible ERR calculations and an unresolved question about whether more than 50% of generated electricity is exported to the grid, undermining the captive-use premise. The verified ERR for the first monitoring period is only about half the pro-rata expectation, suggesting the ex-ante estimate was optimistic. Documentation gaps and a contradiction in reported ERR figures further erode confidence.

Red Flags

  • Verified ERR (5,716 tCO₂e) is only ~51% of the pro-rata expectation (~11,230 tCO₂e) for the 23-month monitoring period, indicating the ex-ante estimate of 41,020 tCO₂e over 7 years may be significantly overstated.
  • Material finding in the verification report flags unclear energy balance with potential export of >50% electricity to the grid, which challenges the project's eligibility under the captive-use/mini-grid methodology (AMS-I.F.).
  • ERR calculations were found not reproducible due to missing details on operating margin emission factors, a fundamental MRV weakness.
  • Contradiction in verified ERR: the verification report (Apr 2023) states 5,716 tCO₂e while the PDD (May 2022) states 4,747 tCO₂e, a 20% discrepancy unexplained in the extracted record.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Renewable energy, no reversal risk

Leakage

0% deemed negligible, appropriate for solar

Baseline

Jurisdictional grid EF (0.9305, 2021)

Safeguards

Grievance & benefit sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS-I.F.: Renewable electricity generation for captive use and mini-grid

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents