HPP Project Liberia
#55of 629 in Verra (VCS)#5of 26 in AMS-I.F
Audit Analysis
Partial evidence scope: an official registry-linked validation report and monitoring report text are available, but the project documents are old and no recent verification evidence is provided. The project is a small run-of-river hydropower installation in Liberia with audited validation findings, but claim safety is limited by age and the absence of recent verification/issuance context.
Red Flags
- Project evidence is dated: validation and project start period are from 2016, with no recent verification shown.
- No current issuance/retirement record or recent monitoring cycle is provided, limiting claim safety for present-day use.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 9,100 | 9,100 | 0 | |
| 2018 | 13,806 | 4,126 | 9,680 | |
| Total | 22,906 | 13,226 | 9,680 |
Risk Indicators
mixed evidence / unresolved risk
documented evidence
documented evidence
mixed evidence / unresolved risk
documented evidence
mixed evidence / unresolved risk
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →